Dong Nai 2 500kV transformer station and connection line
Project number
PR2300040241-00
Notice type
Real announcement
Project name
Dong Nai 2 500kV transformer station and connection line
Project objective
Ensuring electricity supply to the load and meeting the needs of economic development and commune
Association of Dong Nai province and the Southeastern provinces.
- Reduce the load for transformers (MBA) 500/220 kV at the transformer station (TBA) 500
KV Song May, Long Thanh, Phu My and 220 kV lines exist in the area
.
- Contribute to ensuring N-1 criteria, strengthening the stability of the electrical system, improving the degree
Trust and safety of electricity supply for the national electricity system.
- In accordance with the VII power planning and the VIII power planning (has been
Set
Authority
Nguyen Tuan Tung
Project duration
2024 Year
Project management Type
The investor directly manages the project
Implementation location
Huyện Xuân Lộc, Dong Nai
Project approval ID
242/QĐ-HĐTV
Project approval date
14/10/2021
Approval authority
Tổng công ty Truyền tải Điện Quốc Gia
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
QDPD FS TBA 500 kV Dong Nai 2 va dau noi (F).pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans for this project
| NO |
Contractor selection plan ID |
Contractor selection plan name |
Total investment |
|
1
|
|
1.448.850.000 VND |
|
2
|
|
341.103.080.000 VND |
Total amount |
342.551.930.000 VND |
Statistical table of bidding packages under the project
| Statistics by type of bidding package |
Statistics by form |
Online bidding value (billion VND) |
Number of bidding packages whose results have been posted |
| Goods |
Civil Works |
Consulting |
Other categories |
Non-Consulting |
Online |
Offline |
| 0 |
2 |
2 |
0 |
2 |
5
|
1 |
342.40
|
5
|