Dredging infield canals and ditches

Watching    
Project Overall procurement plan Contractor selection plan
Found: 17:35 27/10/2025
Project number
PR2500055087-00
Notice type
Real announcement
Project name
Dredging infield canals and ditches
Project objective
Clearing the flow on the route, ensuring environmental hygiene in the area is not polluted, reinforcing canal banks to prevent landslides, creating a premise for socio-economic development in the area, fully exploiting the potential of water surface land to serve farming and agricultural production.
Investor ID
vnz000044195
Authority
Manager
Project duration
1 Year
Project Category
Group C
Project management Type
The investor hired project management consultancy
Use of ODA funds
No
Implementation location
Xã Long Cang, Tay Ninh province
Investment Total Value
To view full information please Login or Register
Project approval ID
1843/QĐ-UBND
Project approval date
22/10/2025
Approval authority
UBND xã Long Cang
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet
You did not use the site, Click here to remain logged. Timeout: 60 second