Equipped with a cooling equipment control system to save power consumption at telecommunications stations in 2026
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600016285-00
Notice type
Real announcement
Project name
Equipped with a cooling equipment control system to save power consumption at telecommunications stations in 2026
Project objective
+ Reduce from 5% to 10% electricity consumption (in kWh) compared to the same period in 2025 at stations where the solution is deployed.
+ Ensure working conditions and environment of VT-IT equipment at the station, without affecting equipment longevity and information security.
+ Added machine room temperature monitoring feature for field staff to proactively monitor and manage stations.
+ Recalling air conditioners at stations where the solution has been implemented (currently using 02 air conditioners/station) to serve air conditioning.
Authority
Thanh Hoa Telecommunications Director
Project management Type
The investor directly manages the project
Implementation location
Thanh Hoa Province
Project approval ID
1093/QĐ-VNPT-THA-KTĐT
Project approval date
07/04/2026
Approval authority
Viễn thông Thanh Hóa
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
1_QĐ phê duyệt DA, KHLCNT làm mát_2026.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet