DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: Electricity of Vietnam
⚬ Old system: Tập đoàn Điện lực Việt Nam
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor VIETNAM ELECTRICITY:
⚬ Contractor selection plan (phase 2 - overall) Hoa Binh Power Plant Expansion Project
- The following contractor selection plans have the investor :
⚬ Plan to select contractor for package No. 9PTV-HB: Organize the event to start construction of the Works
- The following bidding packages have the investor VIETNAM ELECTRICITY:
⚬ Package 1PTV-HB: Transporting electromechanical equipment, transformer and GIS 500KV distribution station
⚬ Bidding package 6PTV-HB: Control tests for welding roads
⚬ Package No. 3HH-HB: Supply of materials and equipment, construction and installation of items to renovate 220kV transmission lines and install 500kV lines connecting from Hoa Binh hydropower plant to the national power system.
⚬ Package No. 17TV-HB: Advice on making dossiers of application for environmental licenses
⚬ Bidding package No. 7PTV-HB: Testing and registration of pressure equipment and small crane in the factory
⚬ Package No. 3TB-HB: Supply and installation of elevators for the factory
⚬ Bidding package No. 5PTV-HB: Measuring and testing samples of electricity measurement system
⚬ Bidding package No. 13TV-HB: Project audit consultancy
- The following bidding packages have the investor :
⚬ Package No. 9PTV-HB: Organizing the groundbreaking event for the construction of Hoa Binh Hydropower Plant Extension Project
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Contractor selection plans for this project
| NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
|---|---|---|---|
|
1
|
0 VND |
||
|
2
|
9.220.831.000.000 VND |
||
Total amount |
9.220.831.000.000 VND |
||
Statistical table of bidding packages under the project
| Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
|---|---|---|---|---|---|---|---|---|
| Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
| 1 | 0 | 3 | 1 | 5 | 7 | 4 | 54.21 | 9 |