Bidder Selection Plan

Contractor selection plan (phase 2 - overall) Hoa Binh Power Plant Expansion Project

  Watching      
This Contractors Selection Plan data is found on both the old and new Public Procurement systems. The data you are viewing is updated from the new Public Procurement system
Find: 14:14 18/12/2025
Contractor Selection Plan ID
20191085960-06
Publishing time
14:08 18/12/2025
Posting Status
Published
Contractor selection plan name
Contractor selection plan (phase 2 - overall) Hoa Binh Power Plant Expansion Project
Project management forms
Another form
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
20191063627-01
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group A
Authority that issues the decision
BAN QUẢN LÝ DỰ ÁN ĐIỆN 1 - CHI NHÁNH TẬP ĐOÀN ĐIỆN LỰC VIỆT NAM
Approval date
17/12/2025
Approval ID
396/QĐ-EVNPMB1
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Investor, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Publication date, Bidding package information (View changes)

- Change: Investor, Lowest bid price, Approval date, Publication date, Bidding package information (View changes)

- Change: Investor, Total investment, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Investor, Total investment, Lowest bid price, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 10
1.Bidding package No. 5PTV-HB: Measuring and testing samples of electricity measurement system
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Measuring, testing samples and testing for the first time, consulting the dossier to submit to the competent authority to approve the measuring vehicle form for the electricity measurement system of the project.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August, 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hòa Bình
2.Tender package No 3TB-HB: Supply and install elevators for the factory
Tender/ Prequalification Notice ID
Contract execution period
11 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Summary of main tasks of the bid package
- Designing, shopping, transporting equipment to the construction site; - Installing, correcting experiments, testing, acceptance and handover of elevators into use; - Training and handling incidents for employees; - Warranty, maintenance in the warranty period.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May, 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hòa Bình
3.Bidding package 6PTV-HB: Control tests for welding roads
Tender/ Prequalification Notice ID
Contract execution period
22 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2023
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hòa Bình
4.Bidding package No. 4PTV-HB: Reviewing the archival document of Hoa Binh Hydroelectric Plant Project expansion
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Receive all documents of the project; - Rectify and arrange documents to price; - Supplying necessary stationery materials and equipment for document adjustment; - Scan Document attached to specialized search software/D-Office; - Making diagrams and explanations of documents arranging documents; Providing specialized archive search software for the management of the entire project documents.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Quarter I, 2026
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hòa Bình
5.Package 1PTV-HB: Transporting electromechanical equipment, transformer and GIS 500KV distribution station
Tender/ Prequalification Notice ID
Contract execution period
25 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
May, 2023
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hòa Bình
6.Tender package No 3HH-HB: Providing equipment and equipment, construction and installation of 220kV line renovation and installation of 500kV line connecting from Hoa Binh hydroelectric plant expanded to the national electricity system
Tender/ Prequalification Notice ID
Contract execution period
23 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
June, 2023
Type of contract
Package and Fixed Price
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hòa Bình
7.Bidding package No. 13TV-HB: Project audit consultancy
Tender/ Prequalification Notice ID
Contract execution period
12 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Project audit according to current regulations.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Fourth quarter, 2025
Type of contract
Fixed unit price
Prequalification
No
Implementation location (After merge)
8.Bidding package No. 7PTV-HB: Testing and registration of pressure equipment and small crane in the factory
Tender/ Prequalification Notice ID
Contract execution period
12 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Testing and granting inspection certificates for pressure equipment and small cranes in the factory; - Technical assistance, record record of pressure equipment, lifting equipment.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hòa Bình
9.Tender package No 12TV-HB: Consulting architectural design and landscape of Hoa Binh Hydroelectric Plant expanded
Tender/ Prequalification Notice ID
Contract execution period
20 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Making basic design; - Making construction drawing design; - Supervise the author during the construction process.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
April 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hòa Bình
10.Tender package No 17TV-HB: Advice on making dossiers of application for environmental licenses
Tender/ Prequalification Notice ID
Contract execution period
15 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Completing the application for an environmental license, testing and operating for the project management area and the factory operation (on the left bank); - Completing the application for environmental licensing, testing for testing items for domestic and industrial wastewater treatment items (on the right shore).
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
April 2024
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
Implementation location (Before merge)
Hòa Bình

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (phase 2 - overall) Hoa Binh Power Plant Expansion Project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (phase 2 - overall) Hoa Binh Power Plant Expansion Project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 14

You did not use the site, Click here to remain logged. Timeout: 60 second