Bidder Selection Plan

Contractor selection plan (phase 2 - overall) Hoa Binh Power Plant Expansion Project

  Watching      
This Contractors Selection Plan data is found on both the old and new Public Procurement systems. The data you are viewing is updated from the new Public Procurement system
Find: 08:24 12/04/2024
Contractor Selection Plan ID
20191085960-04
Publishing time
08:23 12/04/2024
Posting Status
Published
Contractor selection plan name
Contractor selection plan (phase 2 - overall) Hoa Binh Power Plant Expansion Project
Bid Solicitor
Project management forms
Another form
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
20191063627-01
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group A
Authority that issues the decision
HĐTV EVN
Approval date
11/04/2024
Approval ID
58/QĐ-HĐTV
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Related announcements

- Change: Investor, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

- Change: Lowest bid price, Publication date, Bidding package information (View changes)

- Change: Investor, Lowest bid price, Approval date, Publication date, Bidding package information (View changes)

- Change: Investor, Total investment, Publication date, Bidding package information (View changes)

- Change: Publication date, Bidding package information (View changes)

- Change: Investor, Total investment, Lowest bid price, Decision-making agency, Approval date, Approval ID, Publication date, Bidding package information (View changes)

Posted for the first time (View changes)

List of Bid:
Number of packages: 10
1.Tender package No 5PTV-HB: Measuring and testing samples of the power metering system
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Measure, test samples and verify for the first time, consult and prepare documents to submit to the competent authority for approval of measuring device samples for the electricity measurement system of the project.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
August 2024
Type of contract
All in One
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No
2.Tender package No 3TB-HB: Supply and installation of elevators for the factory
Tender/ Prequalification Notice ID
Contract execution period
11 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Goods
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Design, purchase, and transport equipment to the construction site; - Installation, testing, calibration, inspection, acceptance and handover to put the elevator into use; - Operation and troubleshooting training for employees; - Warranty and maintenance during the warranty period.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
May 2024
Type of contract
All in One
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No
3.Tender package No 6PTV-HB: Checking welding seams
Tender/ Prequalification Notice ID
Contract execution period
22 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June, 2023
Type of contract
Fixed unit price
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No
4.Tender package No 4PTV-HB: Editing archives of Hoa Binh Hydropower Plant Extension Project
Tender/ Prequalification Notice ID
Contract execution period
6 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Receive all project documents; - Edit and arrange documents on shelves; - Provide stationery supplies and necessary equipment for document editing; - Scan attached documents to specialized search software/D-Office; - Prepare diagrams and explain document layout; Provide specialized archival document lookup software to manage all project documents.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
May, 2025
Type of contract
Fixed unit price
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No
5.Tender package No 1PTV-HB: Transport of electromechanical equipment, transformers and 500kV GIS distribution station
Tender/ Prequalification Notice ID
Contract execution period
25 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
May, 2023
Type of contract
Fixed unit price
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No
6.Tender package No 3HH-HB: Supply of materials and equipment, construction and installation of items to renovate 220kV transmission lines and install 500kV lines connecting from Hoa Binh hydropower plant to the national power system.
Tender/ Prequalification Notice ID
Contract execution period
23 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Uncategoried
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
June, 2023
Type of contract
Package and Fixed Price
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No
7.Tender package No 13TV-HB: Project audit consulting
Tender/ Prequalification Notice ID
Contract execution period
12 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Audit the project according to current regulations.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
April, 2025
Type of contract
All in One
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No
8.Tender package No 7PTV-HB: Inspection and registration of pressure equipment and small cranes in the factory
Tender/ Prequalification Notice ID
Contract execution period
12 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Inspect and issue inspection certificates for pressure equipment and small cranes in the factory; - Technical support, creating profile records for pressure equipment and lifting equipment.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
June 2024
Type of contract
All in One
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No
9.Tender package No 12TV-HB: Landscape architectural design consultancy for Hoa Binh hydropower plant expansion
Tender/ Prequalification Notice ID
Contract execution period
20 months
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Prepare basic design; - Prepare construction drawing designs; - Supervise the author during the construction process.
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
April 2024
Type of contract
All in One
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No
10.Tender package No 17TV-HB: Consulting on preparing application documents for environmental licensing
Tender/ Prequalification Notice ID
Contract execution period
15 months
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
- Complete the application for an environmental permit and trial operation for the project management and factory operation building (left bank); - Complete the application for an environmental permit and test operation for the project's domestic and industrial wastewater treatment items (right bank).
Capital source details
EVN's equity, Commercial loan
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
April 2024
Type of contract
All in One
Implementation location
Hòa Bình City, Province Hòa Bình
Implementation location (After merge)
Prequalification
No

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (phase 2 - overall) Hoa Binh Power Plant Expansion Project". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (phase 2 - overall) Hoa Binh Power Plant Expansion Project" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 64

You did not use the site, Click here to remain logged. Timeout: 60 second