Increase capacity of Yen Bai 220kV Transformer Station

Watching          
Found: 14:22 23/10/2025
Project number
PR2500054322-00
Notice type
Real announcement
Project name
Increase capacity of Yen Bai 220kV Transformer Station
Project objective
Ensuring safety and improving the reliability of power transmission for Lao Cai province's load in normal and N-1 modes - Meeting the demand for load growth to serve the economic and social development of the Northern region in general and Lao Cai province in particular. Creating seamless connections between areas in Vietnam's power system, increasing stability and safe operation of the power system. Improve voltage quality in the project area and surrounding areas. Reducing the loss of income in collective labor, increasing EVN's production and business efficiency
Investor ID
vn0102743068
Authority
National Power Transmission Corporation
Project duration
15 Month
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Lao Cai province
Investment Total Value
To view full information please Login or Register
Project approval ID
1933/QĐ-EVNNPT
Project approval date
01/10/2025
Approval authority
EVNNPT
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
2.089.447.000 VND
Total amount
2.089.447.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 0 2 0 0 2 0 2.09 2
You did not use the site, Click here to remain logged. Timeout: 60 second