DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
⚬ New system: EVNNPT
⚬ Old system: EVNNPT
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor NATIONAL POWER TRANSMISSION CORPORATION:
⚬ Plan for selecting contractors for phase 3
⚬ Approving the 4th phase of contractor selection plan for the project: Installing 2 220kV Chu Se . substations
- The following bidding packages have the investor NATIONAL POWER TRANSMISSION CORPORATION:
⚬ Package No. 6: Expanded configuration of computer control system
⚬ Package No. 5: Supply and transport the first VTTB
⚬ Package No. 7: Supply, transport and install the second VTTB, TTLL-SCADA
⚬ Package 12: Maintenance, repair and transportation of transformer 220kV-125MVA
⚬ Package No. 11: Auditing the completed project settlement report
- The following bidding packages have the investor The Power Transmission Project Managment Board - Branch of NPT:
⚬ Package 8: Construction and installation of substation (Including supply and installation of fire protection system; Installation of 220 kV - 125 MVA transformer and calibration test)
⚬ Package No. 9: Construction insurance
⚬ Package 10: Construction supervision consultancy
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
Contractor selection plans for this project
| NO | Contractor selection plan ID | Contractor selection plan name | Total investment |
|---|---|---|---|
|
1
|
88.774.000.000 VND |
||
|
2
|
88.774.000.000 VND |
||
Total amount |
177.548.000.000 VND |
||
Statistical table of bidding packages under the project
| Statistics by type of bidding package | Statistics by form | Online bidding value (billion VND) | Number of bidding packages whose results have been posted | |||||
|---|---|---|---|---|---|---|---|---|
| Goods | Civil Works | Consulting | Other categories | Non-Consulting | Online | Offline | ||
| 2 | 1 | 2 | 0 | 4 | 8 | 1 | 53.95 | 8 |