Invest in improving drainage capacity at -35

Watching          
DauThau.info discovered that this project's data collected from the new National Bidding Network System has differences in the investor compared to the data on the old system as follows:
 ⚬ New system: VINACOMIN - THONG NHAT COAL COMPANY
 ⚬ Old system: Công ty Than Thống Nhất - TKV
In addition, the bidding information related to this project also has discrepancies regarding the investor, specifically:
- The following contractor selection plans have the investor VINACOMIN - THONG NHAT COAL COMPANY:
 ⚬ LCNT plan: Investment project to improve drainage capacity at -35

- The following bidding packages have the investor Vinacomin Thong Nhat coal company:
 ⚬ Package No. 6: Design BVTC

 ⚬ Package 5: Off-site pipeline route from MB+41 to MB+25 . Wastewater Treatment Station

 ⚬ Package No. 2: Central pump tunnel and pipeline

 ⚬ Package No. 9: Supervision of equipment installation

 ⚬ Package 3: Equipment for diesel power station

 ⚬ Package 7: Installation of materials, installation of electricity and lighting of power stations, pump tunnels -35

 ⚬ Package No. 1: Construction of a diesel generating station house

 ⚬ Package No. 8: Construction supervision
Click để xem đầy đủClick để thu gọn
Found: 10:27 21/02/2022
Project number
20210572271-01
Notice type
Real announcement
Project name
Invest in improving drainage capacity at -35
Investor ID
vnz000007509
Project Category
Group C
Project management Type
Another form
Use of ODA funds
No
Investment Total Value
To view full information please Login or Register
Project approval ID
508/QĐ-VTNC ngày 24/01/2022 (điều chỉnh)
Project approval date
24/01/2022
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Project versions

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
58.788.008.000 VND
Total amount
58.788.008.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted