Repair damage to the foundation and road surface of section Km0+00-Km0+400; Repair and improve drainage conditions of section Km0+00-Km0+400 (2 sides), Km10+430- Km10+650 (T) on route DT.498C

Watching          
Found: 09:57 01/08/2024
Project number
PR2400041147-00
Notice type
Real announcement
Project name
Repair damage to the foundation and road surface of section Km0+00-Km0+400; Repair and improve drainage conditions of section Km0+00-Km0+400 (2 sides), Km10+430- Km10+650 (T) on route DT.498C
Project objective
Repair damage to roadbed and road surface at section Km0+00-Km0+400; Repair and improve drainage conditions of section Km0+00- Km0+400 (2 sides), Km10+430-Km10+650 (T) on DT.498C route to prevent destruction of foundation and road surface, increase the ability to ensure ensure traffic safety, reduce environmental pollution, and increase project longevity
Investor ID
vnz000005660
Authority
Chairman of Ha Nam Provincial People's Committee
Project duration
1 Year
Project Category
Group C
Project management Type
The investor directly manages the project
Use of ODA funds
No
Implementation location
Ha Nam province
Investment Total Value
To view full information please Login or Register VNĐ
Amount in text format
Project approval ID
1026/QĐ-UBND
Project approval date
30/07/2024
Approval authority
UBND tỉnh Hà Nam
Approval documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.To download, please Login or Register

2024.07.26.05. QĐ phe duyet DA, KHLCNT DA sua chua nen, mat duong, thoat nuoc tren DT498C.pdf
File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Contractor selection plans for this project

NO Contractor selection plan ID Contractor selection plan name Total investment
1
3.030.000.000 VND
2
3.030.000.000 VND
3
86.400.000 VND
Total amount
6.146.400.000 VND

Statistical table of bidding packages under the project

Statistics by type of bidding package Statistics by form Online bidding value (billion VND) Number of bidding packages whose results have been posted
Goods Civil Works Consulting Other categories Non-Consulting Online Offline
0 1 3 0 1 4 1 2.86 4
You did not use the site, Click here to remain logged. Timeout: 60 second