The rooftop solar power system at Thac Mo Hydropower Joint Stock Company is designed for self-consumption and self-generation.
Watching
Project
Overall procurement plan
Contractor selection plan
Project number
PR2600054755-00
Notice type
Real announcement
Project name
The rooftop solar power system at Thac Mo Hydropower Joint Stock Company is designed for self-consumption and self-generation.
Project objective
By utilizing the existing roof space of the factory building, a clean energy source can be installed and directly used to power the factory's self-consumption electrical system. This will help reduce electricity purchase costs, optimize operational cash flow, and align with the parent company's green energy transition strategy.
Authority
General Director
Project management Type
The investor directly manages the project
Project approval ID
2121/QĐ-TMP
Project approval date
07/08/2026
Approval authority
Công ty Cổ phần Thuỷ điện Thác Mơ
Approval documents
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register
3. QĐ Phe duyet BCKTKT V2.0.pdf
Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
Contractor selection plans Link
The project does not have any NTFP yet