Invitation To Bid ( ITB, Tender Notice)

02/XL - construction and installation

Find: 16:09 07/12/2025
Notice Status
Published
Public procurement field
Civil Works
Name of project
Improve power grid operation capacity, reduce power loss and reduce the number of low voltage customers in Ham Yen, Yen Phu, Thai Son, Hung Duc communes, Tuyen Quang province in 2025
Bidding package name
02/XL - construction and installation
Contractor Selection Plan ID
Name of Contractor selection plan
Regarding the approval of the contractor selection plan for the project: Improving power grid operation capacity, reducing electricity loss and reducing the number of low voltage customers in the areas of Ham Yen, Yen Phu, Thai Son, Hung Duc communes, Tuyen Quang province in 2025
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Science and technology capital of EVN NPC
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
Fixed unit price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
Time of bid closing
09:30 16/12/2025
Validity of bid documents
120 days
Approval ID
1893/QĐ-PCTQ
Approval date
07/12/2025 16:08
Approval Authority
CÔNG TY ĐIỆN LỰC TUYÊN QUANG - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
16:08 07/12/2025
to
09:30 16/12/2025
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:30 16/12/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
171.000.000 VND
Amount in words
One hundred seventy one million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 VIETNAM ARCHITECTS COMPANY LIMITED Technical design consultancy, construction drawing design (for two -step design works), estimates 101 Láng Hạ, phường Đống Đa, Thành phố Hà Nộiphường Cam Đường, tỉnh Lào Cai
2 Tuyen Quang Power Company Consulting for setting up E-HSMT Đường Lê Lợi, tổ dân phố Hưng Thành 8, phường An Tường, tỉnh Tuyên Quang
3 Tuyen Quang Power Company E-HSMT . appraisal consulting Đường Lê Lợi, tổ dân phố Hưng Thành 8, phường An Tường, tỉnh Tuyên Quang
4 Tuyen Quang Power Company E-HSDT assessment consulting Đường Lê Lợi, tổ dân phố Hưng Thành 8, phường An Tường, tỉnh Tuyên Quang
5 Tuyen Quang Power Company Consultancy on appraisal of contractor selection results Đường Lê Lợi, tổ dân phố Hưng Thành 8, phường An Tường, tỉnh Tuyên Quang
6 Tuyen Quang Power Company Other consultants that these consulting services have a part directly related to the bidding package Đường Lê Lợi, tổ dân phố Hưng Thành 8, phường An Tường, tỉnh Tuyên Quang

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Xe ô tô tải trọng ≥ 5 tấn
1
2
Xe cẩu ≥ 5 tấn
1
3
Máy kéo, máy hãm ≥ 5 tấn, thiết bị, dụng cụ ra dây lấy độ võng
1

List of construction items:

Form No. 01B. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Phần cung cấp thiết bị và lắp đặt
Theo quy định tại Chương V
2
Phần đường dây trung thế
Theo quy định tại Chương V
3
Cầu dao liên động 3 pha 35kV ngoài trời đường dây (chém ngang) - 630A trọn bộ
3
Bộ
Theo quy định tại Chương V
4
Phần trạm biến áp
Theo quy định tại Chương V
5
Tủ tụ bù 0,4 KV- 90KVAr ( 6x15kVAr trọn bộ)
6
Tủ
Theo quy định tại Chương V
6
Tủ điện 400V-300A (3x250)
4
Tủ
Theo quy định tại Chương V
7
Tủ điện 400V-300A (3x150)
2
Tủ
Theo quy định tại Chương V
8
Chống sét van (chưa gồm đếm sét) 35kV
6
Bộ 3 pha
Theo quy định tại Chương V
9
Lắp đặt Máy biến áp 3 pha 35/0,4kV - 180kVA
6
máy
Theo quy định tại Chương V
10
Phần cung cấp vật tư và lắp đặt
Theo quy định tại Chương V
11
Phần đường dây trung thế
Theo quy định tại Chương V
12
Móng cột đơn đào thủ công MT3-14(TC)
13
móng
Theo quy định tại Chương V
13
Móng cột đơn đào máy MT3-14(M)
3
móng
Theo quy định tại Chương V
14
Móng cột đơn đào thủ công MT4-14(TC)
3
móng
Theo quy định tại Chương V
15
Móng cột đơn đào máy MT4-16(M)
1
móng
Theo quy định tại Chương V
16
Móng cột đơn đào máy MT5-16(M)
2
móng
Theo quy định tại Chương V
17
Móng cột đơn đào máy MT5-18(M)
4
móng
Theo quy định tại Chương V
18
Móng cột đơn đào máy MT5-20(M)
4
móng
Theo quy định tại Chương V
19
Móng cột kép đào thủ công MTK-14(TC)
4
móng
Theo quy định tại Chương V
20
Móng cột kép đào máy MTK-14(M)
3
móng
Theo quy định tại Chương V
21
Móng cột kép đào máy MTK-16(M)
3
móng
Theo quy định tại Chương V
22
Móng cột kép đào máy MTK-18(M)
3
móng
Theo quy định tại Chương V
23
Móng cột kép đào máy MTK-20(M)
2
móng
Theo quy định tại Chương V
24
Tiếp đất RC-4
42
Bộ
Theo quy định tại Chương V
25
Xà đỡ sứ trung gian lệch trái trạm 1 cột ( XTG-1LT)
4
bộ
Theo quy định tại Chương V
26
Xà đỡ sứ trung gian lệch phải trạm 1 cột ( XTG-1LP)
4
bộ
Theo quy định tại Chương V
27
Thanh lắp CSV mặt máy
6
bộ
Theo quy định tại Chương V
28
Xà phụ 1 pha XP-1
2
bộ
Theo quy định tại Chương V
29
Xà phụ 3 pha lệch trái XP-3LT
3
bộ
Theo quy định tại Chương V
30
Xà phụ 3 pha lệch phải XP-3LP
2
bộ
Theo quy định tại Chương V
31
Giá đỡ máy biến áp trạm 1 cột đúp (LT12-14) GĐMĐ-3
3
bộ
Theo quy định tại Chương V
32
Giá đỡ máy biến áp trạm 1 cột đúp (LT16-18) GĐMĐ-4
3
bộ
Theo quy định tại Chương V
33
Ghế cách điện GCĐ-1
6
bộ
Theo quy định tại Chương V
34
Thang săt TS-5,2
6
bộ
Theo quy định tại Chương V
35
Giá đỡ cáp lực trên mặt MBA (GĐC-1)
6
bộ
Theo quy định tại Chương V
36
Giá đỡ tủ
6
bộ
Theo quy định tại Chương V
37
Gằng cột đúp GC-14
3
bộ
Theo quy định tại Chương V
38
Gằng cột đúp GC-16
2
bộ
Theo quy định tại Chương V
39
Gằng cột đúp GC-18
1
bộ
Theo quy định tại Chương V
40
Dây leo tiếp địa trạm 1 cột DLTĐ-14-1
3
bộ
Theo quy định tại Chương V
41
Dây leo tiếp địa trạm 1 cột DLTĐ-16-1
2
bộ
Theo quy định tại Chương V
42
Dây leo tiếp địa trạm 1 cột DLTĐ-18-1
1
bộ
Theo quy định tại Chương V
43
Tiếp địa trạm một cột TĐ-TBA1
6
bộ
Theo quy định tại Chương V
44
Móng cột kép thi công bằng máy MTK-14(TBA)
3
móng
Theo quy định tại Chương V
45
Móng cột kép thi công bằng máy MTK-16(TBA)
2
móng
Theo quy định tại Chương V
46
Móng cột kép thi công bằng máy MTK-18(TBA)
1
móng
Theo quy định tại Chương V
47
Phần đường dây hạ thế
Theo quy định tại Chương V
48
Cáp vặn xoắn AL-XLPE-4x95
19028
m
Theo quy định tại Chương V
49
Cáp vặn xoắn Al/XLPE 4x70
1110
m
Theo quy định tại Chương V
50
Cáp mule vào hộp phân dây Cu/PVC 4x35mm2
340
m
Theo quy định tại Chương V

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "02/XL - construction and installation". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "02/XL - construction and installation" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 14

You did not use the site, Click here to remain logged. Timeout: 60 second