Invitation To Bid ( ITB, Tender Notice)

Bidding package No. 01 additional part: Entire construction + equipment

    Watching    
Find: 09:33 05/11/2023
Notice Status
Published
Category
Civil Works
Name of project
Infrastructure of the residential land plot division planning area in block 4, Tan Ky town, Tan Ky district
Bidding package name
Bidding package No. 01 additional part: Entire construction + equipment
Contractor Selection Plan ID
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Source from residential land auction of the Infrastructure project for residential land division planning in Block 4, Tan Ky Town, Tan Ky District
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution Location
Time of bid closing
10:00 14/11/2023
Validity of bid documents
120 days
Approval ID
179/QĐ-UBND
Approval date
02/11/2023 00:00
Approval Authority
Ủy ban nhân dân thị trấn Tân Kỳ
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
17:13 04/11/2023
to
10:00 14/11/2023
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register
Type of building
Others

Bid award

Bid opening time
10:00 14/11/2023
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Guarantee letter
Bid security amount
65.000.000 VND
Amount in words
Sixty five million dong

Tender Invitation Information

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1 PHẦN HẠ TẦNG KỸ THUẬT
1.1 VỈA HÈ ĐI BỘ + BÓ HÈ + BỒN CÂY
1.1.1 Lát gạch Terrazzo 40x40x3,5cm 2236.918 m2
1.1.2 Bê tông M150 223.692 m3
1.1.3 Trồng cây xanh (cây xoài đường kính thân 9-10cm, cao 3,5-4m) 80 cây
1.1.4 Gạch xây VXM M75 10.138 m3
1.1.5 Vữa xi măng M100 1.267 m3
1.1.6 Bê tông M150 9.293 m3
1.1.7 Đất màu trồng cây 45.76 m3
1.2 TƯỜNG CHẮN TUYẾN D3
1.2.1 Đào móng đất cấp 3 bằng thủ công(5%) 63.84 m3
1.2.2 Đào móng đất cấp 3 bằng máy (95%) 1212.96 m3
1.2.3 Đắp đất K95 bằng đầm cóc 684.5 m3
1.2.4 Vận chuyển đất cấp 3 ra bãi thải cự ly vận chuyển 6 Km 503.315 m3
1.2.5 Bê tông M200 đổ tại chỗ 340.1 m3
1.2.6 Bê tông tường M200 đổ tại chỗ 493.3 m3
1.2.7 Đá dăm đệm 88.3 m3
1.2.8 Vữa xi măng M100 0.074 m3
1.2.9 Đay tẩm nhựa đường 0.833 m3
1.2.10 Ống nhựa D100 48 m
1.2.11 Ván khuôn thép tường chắn 1209.34 m2
1.3 ỐP MÁI ĐÁ HỘC XÂY TUYẾN D4
1.3.1 Đá hộc xây vữa M100 89.221 m3
1.3.2 Đá dăm đệm 8.343 m3
1.3.3 Đào móng đất cấp 3 bằng thủ công(5%) 9.383 m3
1.3.4 Đào móng đất cấp 3 bằng máy (95%) 178.273 m3
1.3.5 Đắp đất K95 bằng đầm cóc 113.801 m3
1.3.6 Vận chuyển đất cấp 3 ra bãi thải cự ly vận chuyển 6 Km 59.061 m3
1.3.7 Bê tông M200 đổ tại chỗ 19.598 m3
1.3.8 Ván khuôn thép đổ tại chỗ 60.3 m2
1.4 LAN CAN ĐẦU TƯỜNG CHẮN
1.4.1 Sắt hộp 80x80x3 424.56 kg
1.4.2 Bản thép 120x120x20 274.5 kg
1.4.3 Bản thép 100x100x10 47.58 kg
1.4.4 Bu lông M14x200 244 cái
1.4.5 Thép bản mã 300x300x4 172.386 kg
1.4.6 Sơn tĩnh điện 1163.026 kg
1.4.7 Gia công cột trụ, lan can thép(VL chính đã tính riêng) 1.163 Tấn
1.4.8 Lắp dựng cột trụ, lan can 1.163 Tấn
1.4.9 Sắt hộp 30x60x1,8 291 kg
1.4.10 Sắt hộp 20x40x1,8 193.8 Kg
1.4.11 Sắt đặc 12x12 969.6 kg
1.4.12 Sắt đặc 10x10 6.72 kg
1.4.13 Sơn tĩnh điện 1461.12 kg
1.4.14 Gia công cột trụ, lan can thép(VL chính đã tính riêng) 1.461 Tấn
1.4.15 Lắp dựng cột trụ, lan can 1.461 Tấn
2 PHẦN ĐIỆN
2.1 ĐƯỜNG DÂY TRUNG THẾ 972&973 35KV- PHẦN XÂY DỰNG
2.1.1 Đào đất móng cột, cấp đất III 88.679 1m3
2.1.2 Đắp đất hố móng 75.779 m3

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors CÔNG TY CP XÂY DỰNG CÔNG TRÌNH 469 as follows:

  • Has relationships with 1 contractor.
  • The average number of contractors participating in each bidding package is: 1.00 contractors.
  • Proportion of bidding fields: Goods 0.00%, Construction 100.00%, Consulting 0.00%, Non-consulting 0.00%, Mixed 0.00%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 26,535,584,000 VND, in which the total winning value is: 26,504,100,784 VND.
  • The savings rate is: 0.12%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Bidding package No. 01 additional part: Entire construction + equipment". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Bidding package No. 01 additional part: Entire construction + equipment" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 6

You did not use the site, Click here to remain logged. Timeout: 60 second