Invitation To Bid ( ITB, Tender Notice)

Civil Works

Find: 08:56 04/06/2019
Notice Status
Posted for the first time
Notify Area
Civil Works
Name of project
Construction of technical infrastructure and environmental improvement of A Phai pagoda ponds
Name of Tender Notice
Civil Works
Contractor Selection Plan ID
Name of Contractor selection plan
Construction of technical infrastructure and environmental improvement of A Phai pagoda ponds
Spending Category
Investment and Development Project
Funding source
Letter of credit or deposit by check
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
National competitive bidding
Package execution location
Time of bid closing
09:00 18/06/2019

Main content

Investment in construction of technical infrastructure and environmental improvement of A Phai pagoda pond on an area of ​​​​S= 3201m2: Carrying out dredging of pond mud with an average depth of 1m, after filling the pond with sand Htb=1m. New construction of stone embankment grade 1, H= 3.5m long L= 254.72m. On the embankment body install handrail stainless steel handrail D60 length L= 244.72m and strut bar handrail solid stainless steel 20x20 with total length L= 99.75m; Refresh Terrazzo brick pavement with area S= 366.43m2 and concrete pavement L= 100m long; Arrange green trees around the promenade and handrail of BTXM turning around the lake; design 02 steps up and down. Design the system of manholes, drains B400 and bearing drains B600. Invest in a synchronous lighting system

Participating in tenders

Bidding method
Directly
Tender documents start selling in
08:30 08/06/2019
to
09:00 18/06/2019
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
1.000.000 VND

Bid award

Award date
09:00 18/06/2019
Price Tender value
The estimate of the bidding package is not published in the Tender Notice (including the Tender Notice published in the bidding newspaper and the Tender Notice published in the public procurement system/national procurement network). Only DauThau.info has the exclusive feature of "scanning" the bid package price. To check the exact price of the software package, please register for one of the VIP software packages (VIP1, VIP2, VIP3...) .
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Type
Letter of credit or deposit by check
Amount of money
55.000.000 VND
Amount in text format
Fifty five million dong

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Ủy ban nhân dân xã Đông Hội as follows:

  • Has relationships with 94 contractor.
  • The average number of contractors participating in each bidding package is: 1.14 contractors.
  • Proportion of bidding fields: Goods 11.02%, Construction 80.31%, Consulting 5.51%, Non-consulting 3.16%, Mixed 0.00%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 543,289,334,060 VND, in which the total winning value is: 540,393,038,728 VND.
  • The savings rate is: 0.53%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Civil Works". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Civil Works" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 78

You did not use the site, Click here to remain logged. Timeout: 60 second