Invitation To Bid ( ITB, Tender Notice)

Civil Works

Find: 15:44 24/09/2019
Notice Status
Posted for the first time
Notify Area
Civil Works
Name of project
Dredging Bau Nhum canal
Name of Tender Notice
Civil Works
Contractor Selection Plan ID
Name of Contractor selection plan
Plan to select contractor for Bau Nhum canal dredging project
Spending Category
Investment and Development Project
Funding source
City budget decentralized to the district (new rural capital)+ and people's mobilization capital
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
National competitive bidding
Contract Execution location
Time of bid closing
09:00 08/10/2019

Main content

Dredging the bottom of the canal with an average width of 5m, slopes 1:1.2. The average dredging depth is 50cm. For the right bank combined with intra-field traffic as follows: + Filling the right bank with part of the land used for canal excavation and selected soil to ensure the width of the embankment surface of 2m, the elevation of the embankment +2.0 for the purpose of connection. In case of in-field traffic to serve the travel needs of people in the area, the embankment coefficient m = 1.50 for both sides. + Spreading the crushed stone layer to finish the right bank +2.20 2m wide, 20cm thick, k ≥ 0.95. For the left bank, embankment to prevent high tides as follows: Filling the left bank with part of the land used to dig canals and selected soil for embankment to ensure a width of the embankment surface of 2m, elevation of the embankment +2.2 for the purpose of connection In case of in-field traffic to serve the travel needs of people in the area, the embankment coefficient m = 1.50 for both sides. To ensure bank stability, prevent landslides and limit encroachment on residential land, reinforced 2 rows of Melaleuca poles with a base diameter of D = (8 - 10)cm, 4.5m long and with bamboo mulch between them. along the excavated roof of the canal, at the foot of the talus along the canal side with a density of 7 trees/md. Install a number of positions of concrete culverts, D300 steel culverts across the banks, with a length of 6m each, with valve gates on the canal side to serve water between the canal and people's fields. Installing 6-mark slitting markers, 3 slits on each side

Participating in tenders

Bidding method
Directly
Tender documents start selling in
16:00 27/09/2019
to
09:00 08/10/2019
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
2.000.000 VND

Bid award

Award date
09:00 08/10/2019
Price Tender value
The estimate of the bidding package is not published in the Tender Notice (including the Tender Notice published in the bidding newspaper and the Tender Notice published in the public procurement system/national procurement network). Only DauThau.info has the exclusive feature of "scanning" the bid package price. To check the exact price of the software package, please register for one of the VIP software packages (VIP1, VIP2, VIP3...) .
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Type
Letter of credit or deposit by check
Amount of money
80.000.000 VND
Amount in text format
Eighty million dong

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Civil Works". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Civil Works" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 81

You did not use the site, Click here to remain logged. Timeout: 60 second