Invitation To Bid ( ITB, Tender Notice)

Construction

    Watching  
Project Contractor selection plan Tender notice Bid award
Find: 09:52 16/03/2018
Notice Status
Change
Notify Area
Civil Works
Name of project
Ai Nghia Kindergarten; Items: Class House A + Administrative area;
Name of Tender Notice
Construction
Spending Category
Mandatory spending activities
Funding source
Ai Nghia Town budget capital and other legal sources
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
National competitive bidding
Package execution location
Related announcements
Time of bid closing
09:00 19/12/2016
AI-classified field

Main content

1x2 M250 stone reinforced concrete foundation, VXM M75 stone foundation bundle. Pillars, columns, reinforced reinforced concrete frames, 1x2 M.250 stone reinforced concrete beams poured in the whole block. Roof deck with 1x2 M.250 stone reinforced concrete. Enclosure wall built with hollow bricks D200, plastered with VXM M.50. Drainage solutions: - Water supply for toilets and domestic water supply. - Drainage of roof water through slugs through pipes and then drain to the general drainage system in the area. Sanitary drainage through septic tanks and drains. Power system: Power is connected from an existing power source; Conductor to the house using wire 3x16+1x10mm2; 1x4mm2; 1x2.5mm2; 1x1.5mm2 to electric plate, wire is protected in protective plastic tube; Control devices (switches, sockets, Aptomat, ..) installed in fireproof plastic boxes buried underground; Installation height of switch, Aptomat, electric plate 1.4m from the ground; Lighting equipment is 2x1.2m, 1x1.2m tube lights; Fan equipment: Ceiling fan with 1.4m wingspan.Fire prevention: Has been granted the certificate of design approval for fire prevention and fighting No. 68.16/TD-PCCC dated May 4, 2016 by the Quang Provincial Police Nam, Department of Fire Prevention and Fighting and Rescue.

Participating in tenders

Bidding method
Directly
Tender documents start selling in
09:00 07/12/2016
to
09:00 19/12/2016
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
2.000.000 VND

Bid award

Award date
09:30 19/12/2016
Price Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Construction". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Construction" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 23

You did not use the site, Click here to remain logged. Timeout: 60 second