Invitation To Bid ( ITB, Tender Notice)

Construction

    Watching    
Find: 17:43 24/10/2024
Click to view DauThau.info's analysis (you will be deducted 2 points).
To view full information, please Login or Register
Notice Status
Published
Public procurement field
Civil Works
Name of project
Repairing Phuc Sen Kindergarten, Quang Hoa district, Cao Bang province
Bidding package name
Construction
Contractor Selection Plan ID
Spending category
Mandatory spending
Domestic/ International
Domestic
Capital source details
Estimated budget expenditure for 2024
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Package execution location
Time of bid closing
09:00 04/11/2024
Validity of bid documents
60 days
Approval ID
41/QĐ-MNPS
Approval date
23/10/2024 15:34
Approval Authority
Trường Mầm non Phúc Sen
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
17:42 24/10/2024
to
09:00 04/11/2024
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:00 04/11/2024
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Commitment (In case the contractor's name on the list does not ensure credibility when participating in the bid, the form of bid security is a Letter of Guarantee or Certificate of Guarantee Insurance)
Bid security amount
12.000.000 VND
Amount in words
Twelve million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Consultants Role Address
1 Công ty TNHH Tư Vấn Xây Dựng Công Trình 689 Consulting, technical design, construction drawing design, estimation Tổ 1, Phường Hoà Chung, Thành phố Cao Bằng, Tỉnh Cao Bằng
2 Công ty TNHH UCE Consulting for setting up E-HSMT Địa chỉ: Thôn Trung Đạo, xã Trung Hưng, huyện Yên Mỹ , tỉnh Hưng Yên
3 Công ty TNHH UCE E-HSDT assessment consulting Địa chỉ: Thôn Trung Đạo, xã Trung Hưng, huyện Yên Mỹ , tỉnh Hưng Yên

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Ô tô tự đổ - tải trọng: ≥ 5 tấn. Có giấy chứng nhận an toàn kỹ thuật và bảo vệ môi trường xe cơ giới còn hiệu lực.
1

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Hạ Tầng kỹ thuật Ngoài nhà
2
Phần phá dỡ:
3
Phá dỡ móng các loại, móng đá
7.4415
m3
4
Phá dỡ tường xây gạch chiều dày tường <=11cm
1.386
m3
5
Phá dỡ tường xây gạch chiều dày tường <=22cm
28.7045
m3
6
Vận chuyển phế thải trong phạm vi 1000m bằng ô tô - 7,0T
37.532
m3
7
Vận chuyển phế thải tiếp 1000m bằng ô tô - 7,0T
37.532
m3
8
Phần sửa chữa
9
Đào đất móng băng bằng thủ công, rộng <= 3m, sâu <= 1m, đất cấp III
8.5653
m3
10
Đắp cát công trình bằng thủ công, đắp nền móng công trình
1.6188
m3
11
Xây móng bằng đá hộc chiều dày <=60cm, vữa XM M75 PCB30
18.6032
m3
12
Xây tường thẳng bằng gạch 2 lỗ rỗng (6,5x10,5x22)cm, chiều dày <=11cm, vữa XM M50 PCB30
20.4471
m3
13
Xây cột, trụ bằng gạch 2 lỗ rỗng (6,5x10,5x22)cm, vữa XM M50 PCB30
2.875
m3
14
Trát tường ngoài chiều dày trát 1,5cm, vữa XM M50 PCB30
566.1303
m2
15
Sơn dầm, trần, cột, tường ngoài nhà không bả bằng sơn các loại, 1 nước lót, 2 nước phủ
566.1303
m2
16
Gia công lắp đặt cánh cổng inox 304
24.87
kg
17
Phần sân vườn
18
Tháo dỡ các cấu kiện bằng bê tông đúc sẵn bằng thủ công, trọng lượng cấu kiện <=100 kg
32
cấu kiện
19
Đào xúc đất bằng thủ công, đất cấp I
1.615
m3
20
Vận chuyển phế thải trong phạm vi 1000m bằng ô tô - 7,0T
1.615
m3
21
Vận chuyển phế thải tiếp 1000m bằng ô tô - 7,0T
1.615
m3
22
Xây gạch 2 lỗ 6,5x10,5x22cm, xây gối đỡ ống, rãnh thoát nước, vữa XM mác 50 PCB30
0.7106
m3
23
Trát tường ngoài chiều dày trát 1,5cm, vữa XM M50 PCB30
6.46
m2
24
Lắp các loại cấu kiện bê tông đúc sẵn bằng thủ công, trọng lượng <= 100kg
32
1 cấu kiện
25
Quét nước xi măng
685.56
m2
26
Lát Gạch Terazzo 400x400x30 màu xám, vữa XM mác 75 PCB30
685.56
m2
27
Bê tông nền, đá 1x2, vữa BT M200 PCB30
4.64
m3
28
Sửa chữa Nhà lớp học 2 phòng + Hội Đồng
29
Phần phá dỡ
30
Tháo dỡ trần
168.7812
m2
31
Phá dỡ tường xây gạch chiều dày tường <=11cm
0.1149
m3
32
Phá dỡ kết cấu bê tông có cốt thép bằng máy khoan cầm tay
0.3132
m3
33
Tháo dỡ kết sắt thép bằng thủ công, chiều cao <= 6m
0.18
tấn
34
Phá dỡ nền gạch xi măng, gạch gốm các loại
172.2671
m2
35
Phá dỡ nền láng vữa xi măng
10.1712
m2
36
Vận chuyển phế thải tiếp 1000m bằng ô tô - 7,0T
5.7487
m3
37
Vận chuyển phế thải tiếp 1000m bằng ô tô - 7,0T
5.7487
m3
38
Tháo dỡ cửa bằng thủ công
37.845
m2
39
Phần Sửa Chữa
40
Gia công Dầm trần thép hộp
0.2625
tấn
41
Gia công Dầm trần thép hộp
0.0095
tấn
42
Lắp dựng Dầm trần thép hộp
0.272
tấn
43
Thi công trần tôn
168.7812
m2
44
Lát nền, sàn bằng gạch tiết diện <= 0,25m2, vữa XM M75 PCB30
172.2671
m2
45
Lát đá bậc tam cấp, vữa XM mác 75 PCB30
12.1272
m2
46
Cửa đi mở quay nhôm Xinhfa hệ 55 khuôn nhôm mầu trắng sứ dày 1.2mm kính trắng an toàn dày 6.38mm
22.905
m2
47
Cửa xổ mở quay, mở trượt nhôm Xinhfa hệ 55 khuôn nhôm mầu trắng sứ dày 1.2mm kính trắng an toàn dày 6.38mm
10.44
m2
48
Vách kính cố định nhôm Xinhfa hệ 55 khuôn nhôm mầu trắng sứ dày 1.2mm kính trắng an toàn dày 6.38mm
4.5
m2
49
Khóa đa điểm
9
bộ
50
Lắp dựng cửa khung sắt, khung nhôm
37.845
m2

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Construction". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Construction" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 14

You did not use the site, Click here to remain logged. Timeout: 60 second