Invitation To Bid ( ITB, Tender Notice)

Construction and installation bidding package

    Watching  
Project Contractor selection plan Tender notice Bid award
Find:
Ghi chú: Gói thầu chỉ dành cho nhà thầu cấp siêu nhỏ, nhỏ (theo quy định của pháp luật doanh nghiệp) tham gia đấu thầu
Notice Status
Posted for the first time
Notify Area
Civil Works
Name of project
Irrigation in Hammer village, Chieng Khuong commune, Song Ma district, Son La province
Name of Tender Notice
Construction and installation bidding package
Spending Category
Investment projects
Funding source
Sources of investment in construction of works in communes up to NTM standards + other capital
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding (Only select domestic contractors)
Contract Execution location
Time of bid closing
09:30 31/03/2017

Main content

Renovating and repairing the old head dam, demolishing the sluice to get water on the right, extending the width of the spillway. Renew the water intake sluice on the right side of the dam. Dredging upstream and downstream of the dam guides the flow into the dam body. The embankment protects the upstream stream bank on the right side of the dam and the canal embankment on the left and right side downstream of the dam. Reinforced concrete channel 65m on the left, 40m on the right.

Participating in tenders

Bidding method
Directly
Tender documents start selling in
08:00 21/03/2017
to
09:30 31/03/2017
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
1.000.000 VND

Bid award

Award date
10:00 31/03/2017
Price Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Type
Bank guarantee certificate
Amount of money
21.000.000 VND
Amount in text format
Twenty one million dong

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án đầu tư xây dựng Sông Mã as follows:

  • Has relationships with 145 contractor.
  • The average number of contractors participating in each bidding package is: 1.40 contractors.
  • Proportion of bidding fields: Goods 1.47%, Construction 89.46%, Consulting 8.82%, Non-consulting 0.25%, Mixed 0.00%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 1,295,782,348,608 VND, in which the total winning value is: 1,228,102,458,390 VND.
  • The savings rate is: 5.22%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Construction and installation bidding package". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Construction and installation bidding package" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 40

You did not use the site, Click here to remain logged. Timeout: 60 second