Invitation To Bid ( ITB, Tender Notice)

Construction of the road lighting system leading to the bridge

Find: 14:30 29/08/2025
Note: DauThau.info automatically determines that this is a bidding package only for micro and small contractors (according to the law on enterprises) participating in the bidding based on Clause 2, Article 7 of Decree No. 24/2024/NĐ-CP of the Government
Notice Status
Published
Public procurement field
Civil Works
Name of project
Tan Phong Bridge, Cai Lay District
Bidding package name
Construction of the road lighting system leading to the bridge
Investor
Contractor Selection Plan ID
Name of Contractor selection plan
Decision No. 96/QD-BQLDAGT dated August 25, 2025
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Provincial budget
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
Time of bid closing
09:00 08/09/2025
Validity of bid documents
90 days
Approval ID
105/QĐ-BQLDAGT
Approval date
29/08/2025 14:25
Approval Authority
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Đồng Tháp
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
14:26 29/08/2025
to
09:00 08/09/2025
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:00 08/09/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Commitment (In case the contractor is named in the list that does not guarantee the prestige when participating in the bid, the bid assurance form is a guarantee letter or a certificate of guarantee insurance)
Bid security amount
40.000.000 VND
Amount in words
Forty million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 Công ty Cổ phần Tư vấn xây dựng công trình 625 Technical design consultancy, construction drawing design (for two -step design works), estimates 11 đường 37, KDC Đông Nam, Phường Hiệp Bình, TP Hồ Chí Minh
2 Công ty TNHH Tư vấn An Nhiên Consulting for setting up E-HSMT số 25A, đường Hoàng Việt, phường Đạo Thạnh, tỉnh Đồng Tháp
3 Ban Quản lý dự án ĐTXD công trình giao thông tỉnh Đồng Tháp E-HSMT . appraisal consulting số 3A, đường Ngô Quyền, phường Mỹ Tho, tỉnh Đồng Tháp
4 Công ty TNHH Tư vấn An Nhiên E-HSDT assessment consulting số 25A, đường Hoàng Việt, phường Đạo Thạnh, tỉnh Đồng Tháp
5 Ban Quản lý dự án ĐTXD công trình giao thông tỉnh Đồng Tháp Consultancy on appraisal of contractor selection results số 3A, đường Ngô Quyền, phường Mỹ Tho, tỉnh Đồng Tháp
6 Ban Quản lý dự án ĐTXD công trình giao thông tỉnh Đồng Tháp Project management consultancy, contract management of the investor or hired by the investor số 3A, đường Ngô Quyền, phường Mỹ Tho, tỉnh Đồng Tháp

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Cầu cẩu ô tô, sức nâng ≥ 3T. Kèm tài liệu chứng minh: giấy kiểm định còn hiệu lực, các tài liệu chứng minh sở hữu, trường hợp đi thuê nhà thầu kèm theo hợp đồng nguyên tắc thuê thiết bị và tài liệu chứng minh sở hữu của đơn vị cho thuê.
1
2
Xe nâng người, chiều cao nâng ≥ 12m. Kèm tài liệu chứng minh: giấy kiểm định còn hiệu lực, các tài liệu chứng minh sở hữu, trường hợp đi thuê nhà thầu kèm theo hợp đồng nguyên tắc thuê thiết bị và tài liệu chứng minh sở hữu của đơn vị cho thuê.
1

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Lắp dựng cột thép tròn côn cao 8m dày 4,0mm (MKNN)
41
Cột
2
Lắp cần đèn đơn cao 2m vươn 1,5m dày 3mm (MKNN)
41
Cần
3
Lắp đèn chiếu sáng LED công suất 100W điều khiển 5 cấp
41
Bộ
4
Hộp nối cáp kín nước cửa trụ IP68 TM-TR-3S
41
Hộp
5
Hộp nối cáp kín nước cửa trụ IP68 TM-TR-B1
41
Cái
6
Rải cáp ngầm CXV/DSTA - 3x16mm2
2338.1
m
7
Luồn dây lên đèn Cu/PVC/PVC 3x2,5mm2
492
m
8
Rải dây đồng trần M25
2338.1
m
9
Lắp đặt ống STK D76 luồn cáp băng đường
42
m
10
Măng sông ống thép STK D76
7
cái
11
Lắp đặt ống nhựa xoắn D30/25 luồn dây tiếp địa trong móng
41
m
12
Lắp đặt ống nhựa xoắn D65/50 luồn cáp trong móng
82
m
13
Lắp đặt ống nhựa xoắn D65/50 luồn cáp đi ngầm
2102
m
14
Măng sông nối ống D65/50
42
Cái
15
Làm tiếp địa an toàn cho trụ điện
41
Bộ
16
Làm đầu cáp
82
Đầu
17
Luồn cáp cửa cột
82
Đầu
18
Tay bắt treo cờ hoặc băng rôn (tay trên + tay dưới: 2 bộ /1 trụ)
82
Bộ
19
Bê tông lót móng cột C10
2.624
m3
20
Bê tông móng cột C15
26.896
m3
21
Khung móng trụ đèn M24x300x300x900
41
Bộ
22
Lưới báo hiệu cáp ngầm
2102
m
23
Gạch thẻ bảo vệ cáp
10510
viên
24
Đào hố móng tủ trên vỉa hè, nền đất
28.864
m3
25
Đào rãnh cáp
675.58
m3
26
Lấp cát rãnh cáp
194.22
m3
27
Lấp đất rãnh cáp
481.36
m3

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Construction of the road lighting system leading to the bridge". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Construction of the road lighting system leading to the bridge" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 8

You did not use the site, Click here to remain logged. Timeout: 60 second