Invitation To Bid ( ITB, Tender Notice)

Consulting, surveying, designing construction drawings of traffic, drainage, water supply, trees

    Watching  
Find: 14:30 05/07/2019
Notice Status
Posted for the first time
Procurement Category
Consulting
Name of project
Upgrading and renovating DT 601 . road
Name of Tender Notice
Consulting, surveying, designing construction drawings of traffic, drainage, water supply, trees
Contractor Selection Plan ID
Name of Contractor selection plan
Upgrading and renovating DT 601 . road
Spending Category
Investment and Development Project
Funding source
NSTP and capital source of Ho Chi Minh road project, La Son - Tuy Loan section
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
National competitive bidding
Contract Execution Location
Time of bid closing
16:00 30/07/2019

Main content

Consulting, surveying, designing construction drawings for traffic, drainage, water supply and trees in the project of upgrading and renovating DT601 road

Participating in tenders

Bidding method
Directly
Tender documents start selling in
16:00 10/07/2019
to
16:00 30/07/2019
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
2.000.000 VND

Bid award

Award date
16:30 30/07/2019
Price Tender value
The estimate of the bidding package is not published in the Tender Notice (including the Tender Notice published in the bidding newspaper and the Tender Notice published in the public procurement system/national procurement network). Only DauThau.info has the exclusive feature of "scanning" the bid package price. To check the exact price of the software package, please register for one of the VIP software packages (VIP1, VIP2, VIP3...) .
Estimated Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Ban QLDA đầu tư xây dựng các công trình giao thông Đà Nẵng as follows:

  • Has relationships with 191 contractor.
  • The average number of contractors participating in each bidding package is: 2.55 contractors.
  • Proportion of bidding fields: Goods 0.74%, Construction 44.12%, Consulting 41.91%, Non-consulting 8.09%, Mixed 5.14%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 269,659,117,000 VND, in which the total winning value is: 265,569,007,582 VND.
  • The savings rate is: 1.52%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Consulting, surveying, designing construction drawings of traffic, drainage, water supply, trees". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Consulting, surveying, designing construction drawings of traffic, drainage, water supply, trees" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 83

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8601 Projects are waiting for contractors
  • 1127 Tender notices posted in the last 24 hours
  • 1900 Contractor selection plan posted in the last 24 hours
  • 25353 Tender notices posted in the past month
  • 40446 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second