Invitation To Bid ( ITB, Tender Notice)

Develop a project to implement silvicultural measures to restore and improve forest quality and develop sustainable forestry in the period 2026 - 2030 in Nghe An province

    Watching    
Find: 09:36 09/07/2026
Notice Status
Published
Public procurement field
Consulting
Name of project
Develop a project to implement silvicultural measures to restore and improve forest quality and develop sustainable forestry in the period 2026-2030 in Nghe An province.
Bidding package name
Develop a project to implement silvicultural measures to restore and improve forest quality and develop sustainable forestry in the period 2026 - 2030 in Nghe An province
Contractor Selection Plan ID
Name of Contractor selection plan
Develop a project to implement silvicultural measures to restore and improve forest quality and develop sustainable forestry in the period 2026-2030 in Nghe An province.
Spending category
Mandatory spending
Domestic/ International
Domestic
Capital source details
Funds not allocated autonomously in 2026 are allocated to the Department of Agriculture and Environment (assigned in Decision 555/QD- SNNMT.K HTC dated July 2, 2026)
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Two Envelopes
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Package execution location
Time of bid closing
09:00 27/07/2026
Validity of bid documents
90 days
AI-classified field
AI-classified business sector
Approval ID
582/QĐ-SNNMT.KHTC
Approval date
09/07/2026 09:34
Approval Authority
Sở Nông nghiệp và Môi trường tỉnh Nghệ An
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
09:35 09/07/2026
to
09:00 27/07/2026
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:00 27/07/2026
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Consultants Role Address
1 Công ty cổ phần tư vấn và xây dựng Hoàng Đức Consulting for setting up E-HSMT Số 5, đường Phan Bội Châu, phường Vinh Hưng, tỉnh Nghệ An
2 Công ty cổ phần Duy Nguyên E-HSMT . appraisal consulting đường Phan Tất Thông, phường Vinh Phú, tỉnh Nghệ An
3 Công ty cổ phần tư vấn và xây dựng Hoàng Đức E-HSDT assessment consulting Số 5, đường Phan Bội Châu, phường Vinh Hưng, tỉnh Nghệ An
4 Công ty cổ phần Duy Nguyên Consultancy on appraisal of contractor selection results đường Phan Tất Thông, phường Vinh Phú, tỉnh Nghệ An

Job category:

Form No. 01A: Bill of Quantities, applied for fixed-price contracts:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
CÔNG TÁC CHUẨN BỊ
2
Thu thập thông tin, tư liệu liên quan phục vụ nhiệm vụ (Từ 600.000 ha trở lên)
23
Công
3
Thiết kế kỹ thuật thực hiện nhiệm vụ
8
Công
4
Thống nhất biện pháp kỹ thuật
8
Công
5
Lập kế hoạch thực hiện nhiệm vụ (Từ 600.000 ha trở lên)
8
Công
6
CÔNG TÁC THỰC ĐỊA
7
Sơ thám, thu thập số liệu, làm thủ tục hành chính với cấp xã, chủ rừng (5 xã đại diện/vùng sinh thái x 3 vùng sinh thái + 20 chủ rừng là tổ chức): 35 xã, chủ rừng
525
Công
8
Rà soát, khoanh vẽ diện tích ưu tiên thực hiện các biện pháp lâm sinh đối với diện tích rừng nghèo, rừng nghèo kiệt, rừng chưa có trữ lượng, đất trống có cây gỗ tai sinh và đất trống chưa có rừng: khoảng 10.000 ha
40
Công
9
Chọn, lập, điều tra, thu thập số liệu trữ lượng rừng trên OTC rừng gỗ tự nhiên (0,1% x 10.000 ha = 10 ha, diện tích OTC điều tra là 1000m2, số lượng OTC cần điều tra là: 10 ha x 10.000m2/1000m = 100 OTC)
850
Công
10
Chọn, lập, điều tra, thu thập số liệu tái sinh rừng trên ô đo đếm tái sinh đối với rừng tự nhiên (5 OTS/OTC x 100 OTC = 500 OTS), diện tích OTS là 16m2
210
Công
11
Phỏng vấn cán bộ, người dân về thực trạng công tác quản lý, sử dụng rừng và đất lâm nghiệp của các đơn vị chủ rừng là tổ chức (5 người/xã,chủ rừng x 35 chủ rừng)
87.5
Công
12
CÔNG TÁC NỘI NGHIỆP
13
Hiệu chỉnh kết quả sau điều tra thực địa và biên tập xây dựng bản đồ phân vùng ưu tiên thực hiện các biện pháp lâm sinh cấp tỉnh (tỷ lệ 1/100.000)
18.5
Công
14
Phân tích số liệu phục vụ viết báo cáo Đề án
150
Công
15
Xây dựng báo cáo Đề án
66
Công
16
Hội nghị, hội thảo tại địa phương, cơ sở
22
Công
17
Chỉnh sửa tài liệu, báo cáo sau hội nghị, hội thảo
15
Công
18
In ấn, giao nộp tài liệu, thành quả
8
Công

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Develop a project to implement silvicultural measures to restore and improve forest quality and develop sustainable forestry in the period 2026 - 2030 in Nghe An province". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Develop a project to implement silvicultural measures to restore and improve forest quality and develop sustainable forestry in the period 2026 - 2030 in Nghe An province" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 15

You did not use the site, Click here to remain logged. Timeout: 60 second