Invitation To Bid ( ITB, Tender Notice)

Editing project documents for building a new drilling rig with a depth of 90m of water

    Watching  
Project Contractor selection plan Tender notice Bid award
Find: 23:01 25/03/2018
Notice Status
Posted for the first time
Procurement Category
Goods
Name of project
Editing project documents for building a new drilling rig with a depth of 90m of water
Name of Tender Notice
Editing project documents for building a new drilling rig with a depth of 90m of water
Bid Solicitor
PAC
Spending Category
Mandatory spending activities
Funding source
From Supplemental Appendix 9313/HD-DKVN dated December 31, 2014 of the 2014 Regular Project Implementation Contract No. 2377/HD-DKVN dated April 10, 2014
Range
Within the scope of the Law on Bidding
Contract Period
To view full information, please Login or Register
Contractor selection methods
National Competitive Bidding
Contract Execution Location
Time of bid closing
14:00 15/04/2015

Participating in tenders

Bidding method
Directly
Tender documents start selling in
14:00 07/04/2015
to
14:00 15/04/2015
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
300.000 VND

Bid award

Award date
14:00 15/04/2015
Price Tender value
Estimated Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors PAC as follows:

  • Has relationships with 11 contractor.
  • The average number of contractors participating in each bidding package is: 5.67 contractors.
  • Proportion of bidding fields: Goods 100.00%, Construction 0%, Consulting 0%, Non-consulting 0%, Mixed 0%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 496,000,000 VND, in which the total winning value is: 496,000,000 VND.
  • The savings rate is: 0.00%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Editing project documents for building a new drilling rig with a depth of 90m of water". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Editing project documents for building a new drilling rig with a depth of 90m of water" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 57

You did not use the site, Click here to remain logged. Timeout: 60 second