Invitation To Bid ( ITB, Tender Notice)

No. 03: Construction

    Watching    
Find: 08:24 07/05/2025
Click to view DauThau.info's analysis (you will be deducted 2 points).
To view full information, please Login or Register
Notice Status
Published
Public procurement field
Civil Works
Name of project
The roof of the hall, the roof of the amusement park (school point A); Iron fence iron flower pillar (score of area B)
Bidding package name
No. 03: Construction
Contractor Selection Plan ID
Name of Contractor selection plan
The roof of the hall, the roof of the amusement park (school point A); Iron fence iron flower pillar (score of area B)
Spending category
Mandatory spending
Domestic/ International
Domestic
Capital source details
From the state budget in 2025
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Competitive Offer
Package execution location
Package execution location (After merge)
Time of bid closing
07:00 14/05/2025
Validity of bid documents
60 days
AI-classified field
Approval ID
E2500184904_2505062213
Approval date
07/05/2025 08:17
Approval Authority
Trường mầm non Thạch Lỗi
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
08:21 07/05/2025
to
07:00 14/05/2025
Document Submission Fees
220.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
07:00 14/05/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Commitment
Bid security amount
5.000.000 VND
Amount in words
Five million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Consultants Role Address
1 TRUONG AN VERIFY & CONSUNTANCY JOINT STOCK COMPANY Technical design consultancy, construction drawing design (for two -step design works), estimates Số nhà 24 ngõ 58 Trần Công Hiến, khu 16- P. Bình Hàn -TP Hải Dương, tỉnh Hải Dương
2 HOANG MINH CONSTRUCTION DESIGN AND TRADING CORPORATION Consulting on technical design verification, construction drawing design (for two -step design works), estimates Khu I, phường Nhị Châu,TP.Hải Dương, tỉnh Hải
3 TRUONG AN VERIFY & CONSUNTANCY JOINT STOCK COMPANY Consulting for setting up E-HSMT Số nhà 24 ngõ 58 Trần Công Hiến, khu 16- P. Bình Hàn -TP Hải Dương, tỉnh Hải Dương
4 TRUONG AN VERIFY & CONSUNTANCY JOINT STOCK COMPANY E-HSDT assessment consulting Số nhà 24 ngõ 58 Trần Công Hiến, khu 16- P. Bình Hàn -TP Hải Dương, tỉnh Hải Dương

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Ô tô tự đổ 5T
1
2
Máy trộn bê tông 250 lít
1
3
Máy mài 2,7kW
1
4
Máy khoan đứng 4,5kW
1
5
Máy hàn điện 23kW
1
6
Máy đầm dùi 1,5kW
1
7
Máy đầm bàn 1kW
1
8
Máy cắt uốn cốt thép 5kW
1
9
Máy cắt bê tông 12CV
1

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Cắt nền sân gạch đỏ 400x400
0.424
100m
2
Phá dỡ nền gạch xi măng, gạch gốm các loại
14
m2
3
Đào móng băng bằng thủ công, rộng ≤3m, sâu ≤1m - Cấp đất II (Hệ số ta luy k=1,1)
11.616
1m3
4
Ván khuôn móng cột - Móng vuông, chữ nhật
0.368
100m2
5
Bê tông móng SX bằng máy trộn, đổ bằng thủ công, chiều rộng ≤250cm, M250, đá 1x2, PCB40
10.56
m3
6
Vận chuyển đất bằng ô tô tự đổ 5T, phạm vi ≤1000m - Cấp đất II
0.1162
100m3
7
Bulong chân cột: M16
32
cái
8
Gia công cột bằng thép hình
0.9067
tấn
9
Lắp cột thép các loại
0.9067
tấn
10
Lắp vì kèo thép khẩu độ ≤18m
0.4988
tấn
11
Gia công vì kèo thép hình khẩu độ nhỏ, khẩu độ ≤12m
0.4988
tấn
12
Gia công xà gồ thép
0.8704
tấn
13
Lắp dựng xà gồ thép
0.8704
tấn
14
Sơn sắt thép bằng sơn các loại 1 nước lót + 2 nước phủ
5.12
1m2
15
Lợp mái che tường bằng tôn múi, chiều dài bất kỳ
2.0194
100m2
16
Tôn úp sườn bản rộng 300, dày 0.45 ly
33.8
md
17
Lát gạch đỏ 400x400, vữa XM M75, XM PCB40
10.56
m2
18
Đào móng băng bằng thủ công, rộng ≤3m, sâu ≤1m - Cấp đất II (Hệ số ta luy k=1,1)
29.503
1m3
19
Ván khuôn móng cột - Móng vuông, chữ nhật
0.444
100m2
20
Bê tông móng SX bằng máy trộn, đổ bằng thủ công, chiều rộng ≤250cm, M250, đá 1x2, PCB40
12.24
m3
21
Vận chuyển đất bằng ô tô tự đổ 5T, phạm vi ≤1000m - Cấp đất II
0.295
100m3
22
Bê tông nền SX bằng máy trộn, đổ bằng thủ công, M250, đá 1x2, PCB40
16.039
m3
23
Bulong chân cột: M16
40
cái
24
Gia công cột bằng thép hình
1.1334
tấn
25
Lắp cột thép các loại
1.1334
tấn
26
Lắp vì kèo thép khẩu độ ≤18m
0.3887
tấn
27
Gia công vì kèo thép hình khẩu độ nhỏ, khẩu độ ≤12m
0.3887
tấn
28
Gia công xà gồ thép
1.0373
tấn
29
Lắp dựng xà gồ thép
1.0373
tấn
30
Sơn sắt thép bằng sơn các loại 1 nước lót + 2 nước phủ
6.4
1m2
31
Lợp mái che tường bằng tôn múi, chiều dài bất kỳ
2.7884
100m2
32
Tôn úp sườn bản rộng 300, dày 0.45 ly
23.46
md
33
Nhân công dọn dẹp vệ sinh hiện trường
2
34
Tháo dỡ hoa sắt tường rào
41.904
m2
35
Phá dỡ kết cấu gạch đá bằng búa căn khí nén 3m3/ph
0.462
m3
36
Xây cột, trụ bằng gạch bê tông 6,5x10,5x22cm, chiều cao ≤6m, vữa XM M75, PCB40
1.0164
m3
37
Trát trụ cột, lam đứng, cầu thang, dày 1,5cm, vữa XM M75, PCB40
15.048
m2
38
Sơn cột, tường ngoài nhà không bả bằng sơn các loại 1 nước lót + 2 nước phủ (VDMH)
15.048
m2
39
Gia công hàng rào sắt (VDMH)
0.3885
tấn
40
Lắp dựng lan can sắt
41.904
m2
41
Sơn sắt thép bằng sơn các loại 1 nước lót + 2 nước phủ
26.9658
1m2

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "No. 03: Construction". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "No. 03: Construction" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 17

You did not use the site, Click here to remain logged. Timeout: 60 second