Invitation To Bid ( ITB, Tender Notice)

Package 01: Construction (Bidding Tender package No 01)

    Watching  
Project Contractor selection plan Tender notice Bid award
Find: 04:16 04/04/2018
Notice Status
Posted for the first time
Notify Area
Civil Works
Name of project
District Culture, Information and Sports Center (Items: Stadium watering system; 02 volleyball courts; TTVH drainage ditch; Cultural entrance and internal road; lighting system)
Name of Tender Notice
Package 01: Construction (Bidding Tender package No 01)
Spending Category
Mandatory spending activities
Funding source
Provincial budget to support target + District budget
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
National competitive bidding
Contract Execution location
Time of bid closing
15:00 29/06/2016

Main content

a. Road items: - Total construction length of internal roads is 747.17m, including roads No. 1,2,3,N9. - Road No. 1,2:  Length of design route: 492.39m - Road No. 3:  Length of design route: 90.74m - Road N9:  Length of design route: 164.04m b. Drainage items:  Total length of branch 1 drainage ditch (ditch B400) is 415.41m.  Total length of branch 2 drainage ditch (ditch B400) is 353.98m.  Total length of branch 2 drainage ditch (ditch B600) is 241.78m.  Total length of branch sewer 2 (D800) is 194.00m.  Total length of sewer from branch 1 to branch 2 (D400) is 8.5m.  Drainage direction from branch ditch 1 through culvert D400 to branch ditch 2 to culvert D800 drains out the outlet and pours into the existing earth ditch. c. Internal lighting items: - Lighting system is arranged on the left side of the route, about 84m/post. - Led light section  Led pillar foundation: Dig the ground for pillar foundation: dig square with 0.6m side, 1.0m deep  Pillar foundation reinforcement: Bulon for pillar foundation made of 1m long D20 ribbed steel: 04 D20 steel bars welded into the frame , welded 04 steel belts 10, interlaced threaded ends.  Before pouring concrete 1x2 pillar foundation, it is necessary to put HDPE twisted pipe to the flange to thread the cable, the number of pipes in and out depends on the position and direction of the next wire.  Led light rod: made of d60 single steel, 2m high, 1.5m long (equivalent to respect) - Lamp post: d. Item of lawn watering system: - Design of water tank with volume of 10m3, size 1.7x4m, water fountain with frame made of steel L50x5, diagonal and horizontal bar D16@300, painted with 1 anti-rust water  2 structures color. -Other contents as stated in the approved economic and technical report

Participating in tenders

Bidding method
Directly
Tender documents start selling in
07:00 16/06/2016
to
15:00 29/06/2016
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
2.000.000 VND

Bid award

Award date
15:10 29/06/2016
Price Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Type
Deposit by Check or Bank Guarantee
Amount of money
60.000.000 VND
Amount in text format
Sixty million dong

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 01: Construction (Bidding Tender package No 01)". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 01: Construction (Bidding Tender package No 01)" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 41

You did not use the site, Click here to remain logged. Timeout: 60 second