Package 01: The entire construction and installation part (Including the cost of building main works and temporary works) Rural road in Nghia Binh commune, the section from Binh Thai hamlet, Nghia Binh commune to Tan Soi hamlet, Nghia Loi commune, Nghia Dan district. (Bidding package for contractors who are small and micro enterprises) (Newspaper 110 dated June 15, 2016)
Watching
ProjectContractor selection planTender noticeBid award
Warning: DauThau.info detected time to evaluate and approve result of this tender notice does not meet Article 12 Bidding Law 2013
-- You will be rewarded if you detect false warnings! See instructions here!
Rural road in Nghia Binh commune, section from Binh Thai hamlet, Nghia Binh commune to Tan Soi hamlet, Nghia Loi commune, Nghia Dan district.
Name of Tender Notice
Package 01: The entire construction and installation part (Including the cost of building main works and temporary works) Rural road in Nghia Binh commune, the section from Binh Thai hamlet, Nghia Binh commune to Tan Soi hamlet, Nghia Loi commune, Nghia Dan district. (Bidding package for contractors who are small and micro enterprises) (Newspaper 110 dated June 15, 2016)
The provincial budget supports and integrates the national target capital for the construction of new rural areas, the district budget supports, the commune budget and mobilizes other lawful capital sources.
The route has a total length of 913.82m. Width of roadbed: *Background=6,0m; Width of road surface: *side=3.5m; Curb width: *sideline=2x1.5m; Horizontal slope of road surface: imface=2%; Sidewalk slope: i margin=4%. Road surface structure: Layer 1: BTXM M200# pavement 20cm thick, 1x2cm gravel; Layer 2: Compacted golden sand foundation 10cm thick; Layer 3: Stone 4x6 12cm thick; The bottom layer of K98 compacted road coat is 30cm thick. Drainage L0=0.75m (including 3 culverts): Using 69-34X profile, design load H30-XB80
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Utilities for you
Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 01: The entire construction and installation part (Including the cost of building main works and temporary works) Rural road in Nghia Binh commune, the section from Binh Thai hamlet, Nghia Binh commune to Tan Soi hamlet, Nghia Loi commune, Nghia Dan district. (Bidding package for contractors who are small and micro enterprises) (Newspaper 110 dated June 15, 2016)". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 01: The entire construction and installation part (Including the cost of building main works and temporary works) Rural road in Nghia Binh commune, the section from Binh Thai hamlet, Nghia Binh commune to Tan Soi hamlet, Nghia Loi commune, Nghia Dan district. (Bidding package for contractors who are small and micro enterprises) (Newspaper 110 dated June 15, 2016)" as soon as they are posted, sign up for DauThau.info's VIP 1 package .
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.