Invitation To Bid ( ITB, Tender Notice)

Package 03 - Construction

Find: 17:29 13/12/2025
Notice Status
Published
Public procurement field
Civil Works
Name of project
35kV output line behind 110kV Hung Yen City 2 substation supplies power to the east of Hung Yen city and the south of Tien Lu district, communicating with 110kV Pho Cao substation
Bidding package name
Package 03 - Construction
Contractor Selection Plan ID
Name of Contractor selection plan
Project contractor selection plan: Output 35kV line behind Hung Yen City 2 110kV Substation 2 to supply power to the East of Hung Yen city and the South of Tien Lu district, contact with Pho Cao 110kV Substation
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Commercial and commercial credit capital of EVNNPC
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
Fixed unit price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
Time of bid closing
08:00 22/12/2025
Validity of bid documents
60 days
AI-classified field
Approval ID
4266/QĐ-PCHY
Approval date
13/12/2025 14:32
Approval Authority
CÔNG TY ĐIỆN LỰC HƯNG YÊN - CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
17:28 13/12/2025
to
08:00 22/12/2025
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
08:00 22/12/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
96.900.000 VND
Amount in words
Ninety six million nine hundred thousand dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 CHAULONG INVESTMENT AND DEVELOPMENT TECHNOLOGY COMPANY LIMITED Technical design consultancy, construction drawing design (for two -step design works), estimates 10 Q30B đường Nguyễn An Ninh, phường Tương Mai, thành phố Hà Nội, Việt Nam
2 SAO MAI CONSTRUCTION INDUSTRIAL CONSULTING COMPANY LIMITED Consulting on technical design verification, construction drawing design (for two -step design works), estimates Số 9A4, Khu dân cư 918, Đường Nguyễn Văn Linh, Phường Long Biên, TP. Hà Nội

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Xe ôtô tải trọng 5-12T
1
2
Xe cẩu tự hành 5-10T
1
3
Máy kéo, máy hãm > 5 tấn; thiết bị, dụng cụ ra dây lấy độ võng
1
4
Máy hàn điện
1
5
Máy phát điện 5-10 kVA
1
6
Máy ép đầu cốt thủy lực cầm tay
2

List of construction items:

Form No. 01B. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
PHẦN VTTB
Theo quy định tại Chương V
2
Chống sét van cho đường dây (chưa gồm đếm sét) 35kV
1
Bộ
Theo quy định tại Chương V
3
Cầu dao liên động 3 pha 35kV ngoài trời đường dây (chém ngang) - 630A
1
Bộ
Theo quy định tại Chương V
4
PHẦN DÂY DẪN
Theo quy định tại Chương V
5
ĐƯỜNG DÂY TRUNG THẾ
Theo quy định tại Chương V
6
Dây ACSR-150/24
12953
m
Theo quy định tại Chương V
7
Dây chống sét TK-50
664
m
Theo quy định tại Chương V
8
ĐƯỜNG DÂY CÁP NGẦM TRUNG THẾ
Theo quy định tại Chương V
9
Cáp ngầm Cu/XLPE/PVC/DSTA/PVC-Fr- 20/35kV 3x240sqmm
250
m
Theo quy định tại Chương V
10
Cáp ngầm Cu/XLPE/PVC/DSTA/PVC-W 20/35kV 3x240sqmm
261
m
Theo quy định tại Chương V
11
Dây AC 150/24-XLPE4.3/HDPE
18
m
Theo quy định tại Chương V
12
Dây AC 70/11-XLPE4.3/HDPE
3
m
Theo quy định tại Chương V
13
Dây đồng mềm M35
30
m
Theo quy định tại Chương V
14
Dây nhôm bọc AV-70
30
m
Theo quy định tại Chương V
15
PHẦN XD ĐZ TRUNG ÁP
Theo quy định tại Chương V
16
Phần móng cột
Theo quy định tại Chương V
17
Móng MT6-20 (M)
5
móng
Theo quy định tại Chương V
18
Móng MT6-20 (TC)
10
móng
Theo quy định tại Chương V
19
Móng MT4-16 (M)
2
móng
Theo quy định tại Chương V
20
Móng MT4-16 (TC)
8
móng
Theo quy định tại Chương V
21
Móng MTK4-16 (M)
1
móng
Theo quy định tại Chương V
22
Móng MTK4-16 (TC)
3
móng
Theo quy định tại Chương V
23
Móng MTK6-20 (TC)
1
móng
Theo quy định tại Chương V
24
Móng MTK6-20 (M)
1
móng
Theo quy định tại Chương V
25
Móng cột MTK8-20B (M)
2
móng
Theo quy định tại Chương V
26
Phần cột
Theo quy định tại Chương V
27
Cột BLTL 20-2400
4
cột
Theo quy định tại Chương V
28
Cột BLTL PC-I-20-190-11
13
cột
Theo quy định tại Chương V
29
Cột BLTL PC-I-20-190-13
6
cột
Theo quy định tại Chương V
30
Cột BLTL PC-I-16-190-9,2
3
cột
Theo quy định tại Chương V
31
Cột BLTL PC-I-16-190-11
15
cột
Theo quy định tại Chương V
32
Phần xà & tiếp địa
Theo quy định tại Chương V
33
Xà XNKD-3T-2M-35(B)-CS
1
bộ
Theo quy định tại Chương V
34
Xà XNKN-3T-2M-35(B)-CS
1
bộ
Theo quy định tại Chương V
35
Xà XNKN-3T-2M-35-CS
2
bộ
Theo quy định tại Chương V
36
Xà XĐ-3T-2M-35-CS
13
bộ
Theo quy định tại Chương V
37
Xà XN-3T-2M-35-CS
2
bộ
Theo quy định tại Chương V
38
Xà XNKN-3T-2M-35
2
bộ
Theo quy định tại Chương V
39
Xà X1Z-3CĐ-35
9
bộ
Theo quy định tại Chương V
40
Xà X2Z-6CN-35
9
bộ
Theo quy định tại Chương V
41
Xà XZKN-6CN-35
3
bộ
Theo quy định tại Chương V
42
Xà XZKD-6CN-35
1
bộ
Theo quy định tại Chương V
43
Xà X2-6CN+1Đ-35
4
bộ
Theo quy định tại Chương V
44
Xà X2KN-6CN+1Đ-35
5
bộ
Theo quy định tại Chương V
45
Xà X2LKN-6Đ-35
1
bộ
Theo quy định tại Chương V
46
Xà X2L-6Đ-35
6
bộ
Theo quy định tại Chương V
47
Xà XP-1Đ
10
bộ
Theo quy định tại Chương V
48
Xà XP-2Đ
1
bộ
Theo quy định tại Chương V
49
Chụp cột ly tâm cột đơn 3,0m
13
bộ
Theo quy định tại Chương V
50
Chụp cột ly tâm cột đơn 3,5m
4
bộ
Theo quy định tại Chương V

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 03 - Construction". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 03 - Construction" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 1