Invitation To Bid ( ITB, Tender Notice)

Package 03: Construction and installation of works

Find: 08:47 11/07/2019
Notice Status
Posted for the first time
Notify Area
Civil Works
Name of project
3-storey building, classroom and principal of Dong Quang Primary School, Thai Nguyen city.
Name of Tender Notice
Package 03: Construction and installation of works
Contractor Selection Plan ID
Name of Contractor selection plan
Construction contractor selection plan: 3-storey block, classroom and principal of Dong Quang Primary School, Thai Nguyen city.
Spending Category
Investment and Development Project
Funding source
city budget
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
National competitive bidding
Contract Execution location
Time of bid closing
14:00 29/07/2019
AI-classified field

Main content

+ Demolition of the entire row of degraded level 4 brand buildings and the stage. + 3-storey block: - The rectangular plan is 25.8m long, 17.2m wide; classroom size 7.0m x 7.8m. Floor height 3.6m, house aperture 7.0m; 2.4m wide corridor, 3.9m pavilion. - The house has a reinforced concrete frame structure M250# bearing, covered with brick walls. - Reinforced concrete roof with 250# mark, heat-resistant roofing with joint-venture corrugated iron, shaped steel purlins. - Walls built with unburnt bricks of 75#, cement mortar of 75#. - Joint venture tiled floor. - Doors and windows use aluminum safety glass doors, protective stainless steel lotus flowers. - The whole house is plastered with VXM mark 75#, plastered with columns, beams and ceilings of VXM mark 75#, 1.5cm thick. Paint roller 3 countries to complete the whole house. - Synchronous power supply according to the project. - Water supply and drainage according to the school's common system. - Synchronous fire protection system according to the project. The architectural form of the building is elegant and modern in accordance with the content and nature of the work. + Build a stage in front of the project.

Participating in tenders

Bidding method
Directly
Tender documents start selling in
14:00 16/07/2019
to
14:00 29/07/2019
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
2.000.000 VND

Bid award

Award date
14:15 29/07/2019
Price Tender value
The estimate of the bidding package is not published in the Tender Notice (including the Tender Notice published in the bidding newspaper and the Tender Notice published in the public procurement system/national procurement network). Only DauThau.info has the exclusive feature of "scanning" the bid package price. To check the exact price of the software package, please register for one of the VIP software packages (VIP1, VIP2, VIP3...) .
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Type
Letter of credit or deposit by check
Amount of money
78.000.000 VND
Amount in text format
Seventy eight million dong

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Ban quản lý dự án đầu tư xây dựng thành phố Thái Nguyên as follows:

  • Has relationships with 161 contractor.
  • The average number of contractors participating in each bidding package is: 1.69 contractors.
  • Proportion of bidding fields: Goods 4.35%, Construction 39.83%, Consulting 13.22%, Non-consulting 0.00%, Mixed 1.38%, Other 41.22%.
  • The total value according to the bidding package with valid IMP is: 3,303,528,139,848 VND, in which the total winning value is: 3,253,931,302,873 VND.
  • The savings rate is: 1.50%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 03: Construction and installation of works". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 03: Construction and installation of works" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 42

You did not use the site, Click here to remain logged. Timeout: 60 second