Site clearance and demolition of old 5-storey apartment building; Construction of technical infrastructure for urban embellishment at alley 75 Ly Thanh Tong, Do Son district
Bidding package name
Package 04: Construction and equipment installation
Contractor Selection Plan ID
Name of Contractor selection plan
Contractor selection plan for site clearance and demolition of old 5-storey apartment building; Construction of technical infrastructure for urban embellishment at alley 75 Ly Thanh Tong, Do Son district
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Hai Phong city budget (Public investment capital)
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
Fixed unit price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
- Phường Đồ Sơn, City Hải Phòng
Time of bid closing
08:00 08/12/2025
Validity of bid documents
90 days
Approval ID
68/QĐ-BQLDAKVĐS
Approval date
28/11/2025 17:14
Approval Authority
Ban Quản lý dự án khu vực Đồ Sơn
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
17:14 28/11/2025
to
08:00 08/12/2025
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
08:00 08/12/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Commitment (In case the contractor is named in the list that does not guarantee the prestige when participating in the bid, the bid assurance form is a guarantee letter or a certificate of guarantee insurance)
Bid security amount
45.000.000 VND
Amount in words
Forty five million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 SONG DA TRADING AND CONSTRUCTION CONSULTING JOINT STOCK COMPANY Technical design consultancy, construction drawing design (for two -step design works), estimates Số 9/133 Chùa Hàng - - Phường Lê Chân - Thành phố Hải Phòng
2 UME CONSTRUCTION AND DESIGN CONSULTING JOINT STOCK COMPANY Consulting on technical design verification, construction drawing design (for two -step design works), estimates Số 4/53/51 Phố Phạm Tử Nghi - - Phường An Biên - Thành phố Hải Phòng
3 UME CONSTRUCTION AND DESIGN CONSULTING JOINT STOCK COMPANY Consulting for setting up E-HSMT Số 4/53/51 Phố Phạm Tử Nghi - - Phường An Biên - Thành phố Hải Phòng
4 TUONG LAM TRADING AND CONSULTANCY DESIGN CONSTRUCTION JOINT STOCK COMPANY E-HSMT . appraisal consulting Số 43 Tây Trung Hành - - Phường Hải An - Thành phố Hải Phòng
5 UME CONSTRUCTION AND DESIGN CONSULTING JOINT STOCK COMPANY E-HSDT assessment consulting Số 4/53/51 Phố Phạm Tử Nghi - - Phường An Biên - Thành phố Hải Phòng
6 TUONG LAM TRADING AND CONSULTANCY DESIGN CONSTRUCTION JOINT STOCK COMPANY Consultancy on appraisal of contractor selection results Số 43 Tây Trung Hành - - Phường Hải An - Thành phố Hải Phòng

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Máy đào một gầu, bánh xích - dung tích gầu : 0,40 m3
1
2
Máy cắt gạch đá - công suất : 1,7 kW
2
3
Máy cắt uốn cốt thép - công suất : 5,0 kW
1
4
Máy đầm bê tông, đầm bàn - công suất : 1,0 kW
2
5
Máy đầm bê tông, dầm dùi - công suất : 1,5 kW
1
6
Máy đầm đất cầm tay - trọng lượng : 70 kg
2
7
Máy hàn xoay chiều - công suất : 23,0 kW
1
8
Máy trộn bê tông - dung tích : 250,0 lít
1
9
Máy trộn vữa 150 lít
1
10
Ô tô tự đổ - trọng tải : 7,0 T
2

List of construction items:

Form No. 01B. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Ván khuôn thép. Ván khuôn móng cột
0.036
100m2
Theo quy định tại Chương V
2
Đổ bê tông thủ công bằng máy trộn, bê tông lót móng, chiều rộng <= 250 cm, đá 4x6, vữa mác 100, PCB30
0.154
m3
Theo quy định tại Chương V
3
Đổ bê tông thủ công bằng máy trộn, bê tông móng, chiều rộng <= 250 cm, đá 2x4, mác 150, PCB30
0.847
m3
Theo quy định tại Chương V
4
Đắp đất công trình bằng đầm đất cầm tay 70kg, độ chặt yêu cầu K=0,85
0.0068
100m3
Theo quy định tại Chương V
5
Vận chuyển đất bằng ôtô tự đổ 5 tấn trong phạm vi <= 1000m, đất cấp II
0.1519
100m3
Theo quy định tại Chương V
6
Cột LT8-160-3.5
1
cột
Theo quy định tại Chương V
7
Cột LT8-160-3.5
1
cột
Theo quy định tại Chương V
8
Dựng cột bê tông, chiều cao cột ≤8,5m, bằng cần cẩu kết hợp thủ công
1
cột
Theo quy định tại Chương V
9
Hào 2 cáp 0.4kV - dưới nền quy hoạch (QH2)
m
Theo quy định tại Chương V
10
Đào móng công trình, chiều rộng móng <= 6m, bằng máy đào 0,4m3, đất cấp II (50% KL)
0.1824
100m3
Theo quy định tại Chương V
11
Đào kênh mương, rãnh thoát nước, đường ống, đường cáp bằng thủ công, rộng <= 1m, sâu <=1m, đất cấp II (50% KL)
18.24
m3
Theo quy định tại Chương V
12
Cát đen
12.768
m3
Theo quy định tại Chương V
13
Bảo vệ đường cáp ngầm - Rải cát đệm
12.768
m3
Theo quy định tại Chương V
14
Băng Nilong báo cáp
96
m
Theo quy định tại Chương V
15
Bảo vệ đường cáp ngầm - Rải lưới ni lông
0.384
100m2
Theo quy định tại Chương V
16
Đắp đất công trình bằng đầm đất cầm tay 70kg, độ chặt yêu cầu K=0,85
0.2112
100m3
Theo quy định tại Chương V
17
Vận chuyển đất bằng ôtô tự đổ 5 tấn trong phạm vi <= 1000m, đất cấp II
0.0632
100m3
Theo quy định tại Chương V
18
Tháo, lắp lại cáp vặn xoắn 4x120mm2
0.05
1km/ 1dây (4 sợi)
Theo quy định tại Chương V
19
Kẹp treo 4x70 - 4x150
1
cái
Theo quy định tại Chương V
20
Tấm treo 20
1
cái
Theo quy định tại Chương V
21
Đai thép + khóa đai
26
cái
Theo quy định tại Chương V
22
Ghíp nhôm 3 bulông A25-150
10
cái
Theo quy định tại Chương V
23
Tháo, lắp lại hòm công tơ. Hòm công tơ đã lắp các phụ kiện và công tơ. Hộp <= 2 CT (hộp 1CT 3 pha)
1
1 hộp
Theo quy định tại Chương V
24
Tháo, lắp lại hòm công tơ. Hòm công tơ <= 4 CT (hộp 2CT 3 pha)
4
1 hộp
Theo quy định tại Chương V
25
Tháo hạ cột bê tông <=8,5m
2
1 cột
Theo quy định tại Chương V
26
Thí nghiệm tiếp đất của cột điện, cột thu lôi bằng bê tông
1
1 vị trí
Theo quy định tại Chương V
27
Ghế công viên nhôm đúc không tựa
15
cái
Theo quy định tại Chương V
28
Thùng rác 2 ngăn ngoài trời vân gỗ
5
cái
Theo quy định tại Chương V
29
Dụng cụ tập lưng hông
2
bộ
Theo quy định tại Chương V
30
Dụng cụ đi bộ trên không
2
bộ
Theo quy định tại Chương V
31
Xà kép tập tay ngực
2
bộ
Theo quy định tại Chương V
32
Dụng cụ tập lưng bụng
2
bộ
Theo quy định tại Chương V
33
Dụng cụ đạp chân
2
bộ
Theo quy định tại Chương V
34
Dụng cụ tập xoay eo
2
bộ
Theo quy định tại Chương V
35
Công tác gia công, lắp đặt cốt thép bê tông đúc sẵn. Cốt thép tấm đan
0.004
tấn
Theo quy định tại Chương V
36
Lắp các loại cấu kiện bê tông đúc sẵn bằng thủ công, trọng lượng <= 75kg
1
1 cấu kiện
Theo quy định tại Chương V
37
III. HỘP VÒI TƯỚI CÂY
Theo quy định tại Chương V
38
Đào móng hố van tưới
0.0365
m3
Theo quy định tại Chương V
39
Đổ bê tông thủ công bằng máy trộn, bê tông gối đỡ, đá 2x4, mác 150, PCB40
0.0038
m3
Theo quy định tại Chương V
40
Hộp vòi tưới cây bằng Inox
5
cái
Theo quy định tại Chương V
41
Tê HDPE D25
4
cái
Theo quy định tại Chương V
42
Măng sông ren trong HDPE D20/25
10
cái
Theo quy định tại Chương V
43
Rắc co D20
5
cái
Theo quy định tại Chương V
44
Lắp đặt van 2 chiều D25 ren đồng
5
cái
Theo quy định tại Chương V
45
Cút ren trong HDPE D25
5
cái
Theo quy định tại Chương V
46
Đầu nhựa nối ống mềm D25
5
cái
Theo quy định tại Chương V
47
CÂY XANH
Theo quy định tại Chương V
48
Trồng cây xà cừ, đường kính thân 42-45cm
1
1 cây
Theo quy định tại Chương V
49
Trồng cây sứ đại, đường kính thân 12-14cm
2
1 cây
Theo quy định tại Chương V
50
Trồng cây hoa ban, đường kính thân 12-14cm
8
1 cây
Theo quy định tại Chương V

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 04: Construction and equipment installation". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 04: Construction and equipment installation" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 2

You did not use the site, Click here to remain logged. Timeout: 60 second