Invitation To Bid ( ITB, Tender Notice)

Package 04: Construction and installation of works

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 07:54 14/01/2026
Notice Status
Published
Public procurement field
Civil Works
Name of project
Embellish and expand outdoor entertainment and community activities at San Chi cultural house, Dong Ngu commune
Bidding package name
Package 04: Construction and installation of works
Contractor Selection Plan ID
Name of Contractor selection plan
Project contractor selection plan: Refurbishment and expansion of entertainment and outdoor community activities at San Chi cultural house, Dong Ngu commune
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Dong Ngu commune budget (supported by provincial budget)
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
- Xã Đông Ngũ, Province/City Quảng Ninh
Time of bid closing
08:30 23/01/2026
Validity of bid documents
90 days
Approval ID
89/QĐ-UBND
Approval date
14/01/2026 07:52
Approval Authority
Trung tâm cung ứng dịch vụ xã Đông Ngũ
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
07:52 14/01/2026
to
08:30 23/01/2026
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
08:30 23/01/2026
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
110.000.000 VND
Amount in words
One hundred ten million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 CÔNG TY CỔ PHẦN TƯ VẤN XÂY DỰNG MHD Technical design consultancy, construction drawing design (for two -step design works), estimates Số 25B, Phố Hải Hà - - Phường Hạ Long - Tỉnh Quảng Ninh
2 QUANG NINH BUILDING CONSULTANT AND TECHNOLOGY JOINT STOCK COMPANY Consulting on technical design verification, construction drawing design (for two -step design works), estimates Số 101, Đường, Nguyễn Thượng Hiền - - Phường Hạ Long - Tỉnh Quảng Ninh
3 TIEN PHONG QN CONSULTING CONSTRUCTION LIMITED COMPANY Consulting for setting up E-HSMT 64 Phố Hòa Bình - - Xã Tiên Yên - Tỉnh Quảng Ninh
4 TIEN PHONG QN CONSULTING CONSTRUCTION LIMITED COMPANY E-HSDT assessment consulting 64 Phố Hòa Bình - - Xã Tiên Yên - Tỉnh Quảng Ninh

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Máy đào >= 0,8m3
1
2
Ô tô tự đổ >= 5 tấn
2
3
Đầm bàn >= 1kW
1
4
Đầm dùi >= 1,5kW
1
5
Máy trộn bê tông >= 250L
2
6
Máy đầm đất cầm tay >=70kg
2
7
Máy khoan bê tông cầm tay >=0,62 kW
1
8
Máy thủy bình hoặc máy toàn đạc
1
9
Máy cắt bê tông - công suất 7,5kW
1
10
Mắt cắt uốn thép >=5kW
1
11
Mắt hàn >=23kW
1
12
Máy trộn vữa >=80L
2

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Đào đất cấp 3
27.654
100m3
2
Đắp đất K=0,95
35.451
100m3
3
Tuyến kè số 1
4
Bê tông móng M250 đá 1x2
282.929
m3
5
Bê tông tường M250 đá 1x2
467.549
m3
6
Bê tông lót, đá 2x4, vữa mác 100
33.448
m3
7
Ván khuôn móng
1.881
100m2
8
Ván khuôn tường
16.929
100m2
9
Thi công tầng lọc bằng đá dăm 4x6
0.041
100m3
10
Thi công tầng lọc bằng cát
0.174
100m3
11
Vải lọc lỗ thoát nước lưng tường
0.468
100m2
12
Ống nhựa PVC D50
2.416
100m
13
Cốt thép móng, đường kính cốt thép <= 18mm
12.641
tấn
14
Cốt thép tường, đường kính cốt thép <= 18mm, chiều cao <= 6m
22.631
tấn
15
Cốt thép tường, đường kính cốt thép <= 18mm, chiều cao <= 6m
1.375
tấn
16
Bê tông móng M250 đá 1x2
45.788
m3
17
Bê tông tường M250 đá 1x2
51.397
m3
18
Bê tông xà dầm giằng M200 đá 1x2
17.856
m3
19
Bê tông lót, đá 2x4, vữa mác 100
47.18
m3
20
Ván khuôn móng
1.161
100m2
21
Ván khuôn tường
3.358
100m2
22
Ván khuôn xà dầm
1.036
100m2
23
Cốt thép xà dầm, giằng, đường kính cốt thép <= 10mm, chiều cao <= 6m
0.337
tấn
24
Cốt thép xà dầm, giằng, đường kính cốt thép <= 18mm, chiều cao <= 6m
0.725
tấn
25
Bồn hoa sân vận động
26
Ốp đá bóc xám 200x100mm
322.97
m2
27
Cỏ nhung nhật
397.482
m2
28
Cây Chuỗi Ngọc H=20cm
64.174
1m2
29
Cây Chà Là
26
1 cây
30
Cây Hoa giấy
16
1 cây
31
Trồng cỏ ta ( sân bóng)
3400
1m2/lần
32
Vỉa hè
33
Lát vỉa hè Gạch Terrazzo 400x400x30
1528.34
m2
34
Lát vỉa hè Gạch Terrazzo 400x400x30
28.16
m2
35
Vữa lót M100 dày 2,5cm
38.913
m2
36
Bê tông nền M100 đá 1x2 dày 10cm
m3
37
BTTP bê tông nền, đá 1x2, mác 100
15.711
m3
38
Lót nilon
29.274
100m2
39
Cát sạn đệm dày 5cm
2.163
100m3
40
Bó vỉa
41
Bó vỉa hè KT: 23x26x100cm
253.2
m
42
Lắp đặt viên bó vỉa
253.2
m
43
Vữa lót M100 dày 2,5cm
1.899
m2
44
BT M100 đá 1x2 dày 10cm
0.801
m3
45
Rãnh tam giác
46
Bó vỉa hè KT: 23x26x100cm
253.2
m
47
Lắp đặt viên bó vỉa
253.2
m
48
Vữa lót M100 dày 2,5cm
1.583
m2
49
BT M100 đá 1x2 dày 10cm
0.668
m3
50
Sửa chữa sân khấu

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 04: Construction and installation of works". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 04: Construction and installation of works" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 0

You did not use the site, Click here to remain logged. Timeout: 60 second