Invitation To Bid ( ITB, Tender Notice)

Package 04/SCL2027/PTC3: Providing equipment for selecting the time to turn on/off MC 500kV horizontal compensation resistance (Including installation service, complete configuration) at Vinh Tan 500kV substation

Find: 14:43 04/08/2026
Notice Status
Published
Public procurement field
Goods
Name of project
List of Major Repairs in 2027 of Power Transmission Company 3
Bidding package name
Package 04/SCL2027/PTC3: Providing equipment for selecting the time to turn on/off MC 500kV horizontal compensation resistance (Including installation service, complete configuration) at Vinh Tan 500kV substation
Contractor Selection Plan ID
Name of Contractor selection plan
Plan to select contractors for major repairs in 2027 of Power Transmission Company 3 (phase 1)
Spending category
Other
Domestic/ International
Domestic
Capital source details
SCL 2027
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Simplified Online Bidding
Package execution location
Xã Vĩnh Hảo, Province Lâm Đồng
AI-classified business sector
Approval date
04/08/2026 14:42
Approval Authority
Công ty Truyền tải điện 3

Price Quotation

Price quotation start time
09:00 10/08/2026
Price quotation end time
09:00 11/08/2026
Ceiling price
1.446.251.876 VND
Price step
1.500.000 VND
Validity of bid documents
120 days

List of goods:

Mẫu số 02A. PHẠM VI CUNG CẤP HÀNG HÓA (áp dụng đối với loại hợp đồng trọn gói):

Number Part/lot code Part/lot name Category Brand Manufacturer Origin Year of manufacture Amount Calculation Unit Description Execution location since date The latest delivery date Complete date Note
1
Thiết bị lựa chọn thời điểm đóng/cắt MC K505
Nhà thầu đề xuất
Nhà thầu đề xuất
Nhà thầu đề xuất
Từ 2026 trở đi
1
Bộ
Theo Link đính kèm: https://drive.google.com/drive/folders/10V0hqOB_AWYUJgoSC3vZwHA0kz36RO7T?usp=drive_link
TBA500kV Vĩnh Tân

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 04/SCL2027/PTC3: Providing equipment for selecting the time to turn on/off MC 500kV horizontal compensation resistance (Including installation service, complete configuration) at Vinh Tan 500kV substation". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 04/SCL2027/PTC3: Providing equipment for selecting the time to turn on/off MC 500kV horizontal compensation resistance (Including installation service, complete configuration) at Vinh Tan 500kV substation" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 6

You did not use the site, Click here to remain logged. Timeout: 60 second