Invitation To Bid ( ITB, Tender Notice)

Package 04: The whole construction part

    Watching  
Project Contractor selection plan Tender notice Bid award
Find:
Ghi chú: Gói thầu chỉ dành cho nhà thầu cấp siêu nhỏ, nhỏ (theo quy định của pháp luật doanh nghiệp) tham gia đấu thầu
Notice Status
Posted for the first time
Notify Area
Civil Works
Name of project
Production sugar in Binh Thanh commune
Name of Tender Notice
Package 04: The whole construction part
Bid Solicitor
Spending Category
Investment projects
Funding source
Government budget
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding (Only select domestic contractors)
Contract Execution location
Time of bid closing
08:30 12/12/2017
AI-classified field

Main content

- Route 1: length 3,251.01m; the starting point intersects with the concrete road, the end point intersects with the production area. The roadbed is 4m wide, the road surface is 3m wide, the curb is 2x0.5m, the horizontal slope is 3%, the curb is 4%, the maximum vertical slope is 12%-15%. - Route 2: 762.45m long; The starting point intersects with the main route, the end point is the production forest. The roadbed is 4m wide, the road surface is 3m wide, the curb is 2x0.5m, the horizontal slope is 3%, the curb is 4%, the maximum vertical slope is 12%-15%. - Road surface structure: 20cm thick K95 natural stream; embankment K95; natural background. - On route 1, renew 02 underground overflows, 03 square sluices B=750 stone 1x2, M250, 01 round culvert D=1000 stone 1x2, M250. - On line 2, renew 02 overflow underground, 02 square culverts B=1000 stone 1x2, M250.

Participating in tenders

Bidding method
Directly
Tender documents start selling in
08:30 01/12/2017
to
08:30 12/12/2017
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
2.000.000 VND

Bid award

Award date
08:30 12/12/2017
Price Tender value
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Type
letter of guarantee issued by a bank or a credit institution lawfully operating in Vietnam
Amount of money
45.000.000 VND
Amount in text format
Forty five million dong

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Package 04: The whole construction part". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Package 04: The whole construction part" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 23

You did not use the site, Click here to remain logged. Timeout: 60 second