Invitation To Bid ( ITB, Tender Notice)

Tender package No 09: Construction and equipment supply and installation

Find: 14:43 15/12/2023
Note: DauThau.info automatically determines that this is a bidding package only for micro and small contractors (according to the law on enterprises) participating in the bidding based on Clause 3, Article 6 of Decree No. 63/2014/ND-CP of the Government
Notice Status
Published
Category
Civil Works
Name of project
Le Loi Semi-Boarding Primary School (phase 2)
Bidding package name
Tender package No 09: Construction and equipment supply and installation
Contractor Selection Plan ID
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Budget of Long Xuyen city
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution Location
Related announcements
Time of bid closing
14:00 25/12/2023
Validity of bid documents
150 days
Approval ID
570/QĐ-BQLDA
Approval date
15/11/2023 00:00
Approval Authority
Ban Quản lý dự án ĐTXD Khu vực thành phố Long Xuyên.
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent. To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
14:41 15/12/2023
to
14:00 25/12/2023
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register
Type of building
Educational and Training Facilities

Bid award

Bid opening time
14:00 25/12/2023
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Guarantee letter
Bid security amount
73.000.000 VND
Amount in words
Seventy three million dong

Tender Invitation Information

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
5.2.55 Lắp bộ dây dẫn xuống - dây đồng 24 mét
5.2.56 Kéo dây đồng bọc trong ống ≤1kg 61 mét
5.2.57 Lắp ống bảo vệ bằng nhựa PVC Ø≤25mm 17.5 mét
5.2.58 Lắp ống bảo vệ bằng nhựa PVC Ø≤89mm 8 mét
5.2.59 Lắp bộ xà cột BTLT đã dựng <=15kg 1 bộ
5.2.60 Lắp LA 18kV 3 bộ
5.2.61 Lắp FCO 100A 3 bộ
5.2.62 Lắp MBT 1 pha 12,7/2x0,23kV <=50kVA 1 cái
5.2.63 Lắp tụ bù 1 bộ
5.2.64 Lắp tủ điện 3 pha bằng TC 1 bộ
5.2.65 Lắp Aptomatte + khởi động từ <=250A 1 cái
5.2.66 Lắp điện năng kế 3 pha 1 cái
5.2.67 Lắp cổ dê 8 bộ
5.2.68 Lắp kẹp dây các loại 13 bộ
5.2.69 Lắp đầu coss <=25 mm2 5 cái
5.2.70 Lắp đầu coss <= 95 mm2 2 cái
5.2.71 Lắp đầu coss <=120 mm2 3 cái
5.2.72 Lắp MBT 1 pha 12,7/2x0,23kV <=50kVA (Máy TC) 1 máy
5.2.73 Lắp đầu coss <=25 mm2 (Máy TC) 5 cái
5.2.74 Lắp đầu coss <=95 mm2 (Máy TC) 2 cái
5.2.75 Lắp đầu coss <=120 mm2 (Máy TC) 3 Cái
6 CUNG CẤP, LẮP ĐẶT THIẾT BỊ
6.1 Máy vi tính + Dây mạng + Ổ cắm + Công lắp đặt 36 Cái
6.2 Máy chủ + Bộ chia + Dây mạng + Ổ cắm + Công lắp đặt 1 Cái
6.3 Bàn + ghế máy vi tính 36 Bộ
6.4 Máy lạnh phòng học, phòng ăn: 22 phòng x 2 cái loại 1,5HP 44 Cái
6.5 Máy lạnh khối văn phòng: 5 phòng x 1 cái loại 1HP 5 Cái
6.6 Bàn + ghế học sinh cỡ IV 189 Bộ
6.7 Tivi LCD 85inch 1 Cái
6.8 Máy photocopy 1 Cái
6.9 Tủ sấy khô chén dĩa 1 Cái
6.10 Giường tầng sắt sơn tĩnh điện KT 1,2m x 2m 35 Cái
1 CẢI TẠO KHỐI CHÍNH
1.1 Khu văn phòng:
1.1.1 Phá dỡ tường gạch bằng búa căn khí nén 3m3/ph 21.2006 m3
1.1.2 Tháo dỡ cửa bằng thủ công 25.805 m2
1.1.3 Tháo dỡ trần 842 m2
1.1.4 Phá dỡ nền gạch xi măng 124.51 m2
1.1.5 Tháo dỡ bệ xí (Khu giáo viên) 4 bộ
1.1.6 Cạo bỏ lớp sơn cũ trên tường ngoài nhà 1933.3226 m2
1.1.7 Cạo bỏ lớp sơn cũ trên tường trong nhà 3579.4646 m2
1.1.8 Cạo bỏ lớp sơn cũ trên xà dầm 2950.386 m2
1.1.9 Vận chuyển phế thải, cự ly 1km 26.181 m3
1.1.10 Bê tông lanh tô, M200, đá 1x2 0.88 m3
1.1.11 Cốt thép lanh tô, ĐK ≤10mm 0.0233 tấn
1.1.12 Cốt thép lanh tô, ĐK >10mm 0.0806 tấn
1.1.13 Ván khuôn thép lanh tô 0.132 100m2
1.1.14 Xây tường gạch 19x19x39 dày 19cm, vữa M75 7.119 m3
1.1.15 Trát tường ngoài dày 1,5cm, vữa M75 33.86 m2
1.1.16 Trát tường trong dày 1,5cm, vữa M75 56.6472 m2

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Ban Quản lý dự án Đầu tư xây dựng Khu vực thành phố Long Xuyên as follows:

  • Has relationships with 199 contractor.
  • The average number of contractors participating in each bidding package is: 4.11 contractors.
  • Proportion of bidding fields: Goods 18.75%, Construction 77.78%, Consulting 3.47%, Non-consulting 0.00%, Mixed 0.00%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 1,651,333,154,723 VND, in which the total winning value is: 1,514,674,816,155 VND.
  • The savings rate is: 8.28%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 09: Construction and equipment supply and installation". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 09: Construction and equipment supply and installation" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Support and Error reporting

Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 1

You did not use the site, Click here to remain logged. Timeout: 60 second