Invitation To Bid ( ITB, Tender Notice)

Tender package No 14: Construction, supply and installation of construction equipment

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 23:49 31/12/2025
Notice Status
Published
Public procurement field
Civil Works
Name of project
Component project 2: Road passing through Song Khoai Industrial Park to complete the entire connection route from Ha Long - Hai Phong expressway to Dong Trieu
Bidding package name
Tender package No 14: Construction, supply and installation of construction equipment
Contractor Selection Plan ID
Name of Contractor selection plan
Contractor selection plan for the bidding package to be implemented after project approval (Phase 5) Component project 2: Road passing through Song Khoai Industrial Park to complete the entire connection route from Ha Long - Hai Phong expressway to Dong Trieu
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Provincial budget
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
Fixed unit price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
- Phường Đông Mai, Province/City Quảng Ninh
- Phường Hiệp Hòa
Time of bid closing
09:00 21/01/2026
Validity of bid documents
60 days
Approval ID
1320/QĐ-BKVI
Approval date
31/12/2025 23:47
Approval Authority
Ban Quản lý dự án đầu tư xây dựng khu vực I tỉnh Quảng Ninh
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
23:47 31/12/2025
to
09:00 21/01/2026
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:00 21/01/2026
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
21.434.000.000 VND
Amount in words
Twenty one billion four hundred thirty four million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 Công ty cổ phần xây dựng và tư vấn giao thông Quảng Ninh Technical design consultancy, construction drawing design (for two -step design works), estimates Tổ 5, khu 1, phường Bãi Cháy, tỉnh Quảng Ninh
2 Công ty cổ phần tư vấn xây dựng và quy hoạch hạ tầng Quảng Ninh Consulting on technical design verification, construction drawing design (for two -step design works), estimates Số 151 phố Khâm Thiện, phường Văn Miếu – Quốc Tử Giám, thành phố Hà Nội
3 VIET NAM VALUATION AND INVESTMENT CONSULTANCY JOINT STOCK COMPANY Valuation consulting Số 5, ngõ 111/11, đường Thụy Phương, phường Đông Ngạc, thành phố Hà Nội
4 QUANG NINH TRAFFIC CONSULTANCY JOINT STOCK COMPANY Consulting on creating construction drawing design - joint venture contractor Tổ 5, khu 1, đường Cái Lân, phường Bãi Cháy, tỉnh Quảng Ninh
5 GEO HALONG JOINT STOCK COMPANY Consulting on creating construction drawing design - joint venture contractor Tổ 2, khu 1, phường Bãi Cháy, tỉnh Quảng Ninh
6 Công ty cổ phần thương mại và xây lắp điện Quảng Ninh Consulting on creating construction drawing design - joint venture contractor Số nhà 45, tổ 6, khu 3, phường Hạ Long, tỉnh Quảng Ninh

Renewal information

# Time to Renew Successfully Old bid closing time Time of bid closing after extension Old bid opening time Bid opening time after extension Reason
1 19:07 10/01/2026 09:00 18/01/2026 09:00 20/01/2026 09:00 18/01/2026 09:00 20/01/2026 Modify E-HSMT
2 20:20 10/01/2026 09:00 20/01/2026 09:00 21/01/2026 09:00 20/01/2026 09:00 21/01/2026 Modify E-HSMT

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Máy đào, dung tích gầu ≥ 1.25m3
5
2
Máy ủi ≥ 110CV
5
3
Máy rải cấp phối đá dăm
2
4
Máy rải bê tông nhựa
2
5
Lu rung ≥ 16T
6
6
Lu bánh lốp ≥ 16T
3
7
Lu bánh thép ≥ 8T
3
8
Ô tô tưới nhựa hoặc máy tưới nhựa
1
9
Ô tô tự đổ ≥ 7 tấn
10
10
Máy khoan cọc nhồi
2
11
Máy khoan cọc xi măng đất
1
12
Phòng thí nghiệm chuyên ngành xây dựng được công nhận
1

List of construction items:

Form No. 01B. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Đóng cọc định vị trên cạn, chiều dài cọc <=10 m, đất cấp II
0.06
100m
Theo quy định tại Chương V
2
Đóng cọc định vị trên cạn , chiều dài cọc <=10 m, đất cấp II
0.06
100m
Theo quy định tại Chương V
3
Nhổ cọc định vị bằng cần cẩu 25T, trên cạn
0.06
100m cọc
Theo quy định tại Chương V
4
Cọc ván thép
2517.9169
kg
Theo quy định tại Chương V
5
Ép cừ Larsen- Trên cạn, cấp đất I
7.085
100m
Theo quy định tại Chương V
6
Nhổ cừ Larsen - Trên cạn
2.18
100m
Theo quy định tại Chương V
7
Sản xuất hệ khung chống
0.3697
tấn
Theo quy định tại Chương V
8
Khấu hao hệ khung chống
1.2047
tấn
Theo quy định tại Chương V
9
Lắp dựng kết cấu thép hệ khung dàn, sàn đạo trên cạn
24.2214
tấn
Theo quy định tại Chương V
10
Tháo dỡ kết cấu thép hệ khung dàn, sàn đạo trên cạn
24.2214
tấn
Theo quy định tại Chương V
11
Mặt bằng công trường
Theo quy định tại Chương V
12
Đào đất bằng đất cấp III
6.645
100m3
Theo quy định tại Chương V
13
San đầm đất , độ chặt yêu cầu K=0,90
22.5319
100m3
Theo quy định tại Chương V
14
Thi công móng cấp phối đá dăm loại 2, độ chặt yêu cầu K >= 0,95 (cải tiến)
2.5132
100m3
Theo quy định tại Chương V
15
Rải vải địa kỹ thuật
1.4364
100m2
Theo quy định tại Chương V
16
Bốc xếp đất vào bao tải
41.04
m3
Theo quy định tại Chương V
17
bao tải đất
285
bao
Theo quy định tại Chương V
18
Đắp đất bao tải bằng thủ công
41.04
m3
Theo quy định tại Chương V
19
Đào thanh thải đất , đất cấp II
22.9423
100m3
Theo quy định tại Chương V
20
Cống tròn D150 ( tận dụng cống trên tuyến)
36
m
Theo quy định tại Chương V
21
Bốc xếp cấu kiện bê tông đúc sãn trọng lượng <= 2T
36
cấu kiện
Theo quy định tại Chương V
22
Bốc xếp cấu kiện bê tông đúc sãn trọng lượng <= 2T
36
cấu kiện
Theo quy định tại Chương V
23
Lắp đặt ống cống
36
đoạn ống
Theo quy định tại Chương V
24
Hàng rào công trường
Theo quy định tại Chương V
25
Gia công hàng rào lưới thép
539
m2
Theo quy định tại Chương V
26
Bê tông móng đá 2x4, mác 250, XM PCB40
11.382
m3
Theo quy định tại Chương V
27
Ván khuôn thép. Ván khuôn móng dài
1.626
100m2
Theo quy định tại Chương V
28
Lắp dựng, tháo dỡ cẩu lao dầm
Theo quy định tại Chương V
29
Lắp dựng cẩulao dầm trên cạn
72.92
tấn
Theo quy định tại Chương V
30
Tháo dỡ cẩu lao dầm trên cạn
72.92
tấn
Theo quy định tại Chương V
31
Phần chiếu sáng
Theo quy định tại Chương V
32
Tủ điều khiển chiếu sáng (trọn bộ bao gồm vỏ tủ và thiết bị )
2
Tủ
Theo quy định tại Chương V
33
Cột thép tròn côn cao 11m dày 4mm + Cần đèn đơn cao 2m vươn 1,5m dày 3mm mạ kẽm nhúng nóng
103
Bộ
Theo quy định tại Chương V
34
Cột thép tròn côn cao 11m dày 4mm + Cần đèn đôi cao 2m vươn 1,5m dày 3mm mạ kẽm nhúng nóng
165
Bộ
Theo quy định tại Chương V
35
Cột thép tròn côn cao 6m dày 3mm + Cần đèn đôi cao 2m vươn 1,5m dày 3mm mạ kẽm nhúng nóng
11
Bộ
Theo quy định tại Chương V
36
Đèn chiếu sáng đường phố bóng LED, công suất 100W
11
Đèn
Theo quy định tại Chương V
37
Đèn chiếu sáng đường phố bóng LED, công suất 160W
433
Đèn
Theo quy định tại Chương V
38
Ống nhựa xoắn chịu lực HDPE D65/50
9037
m
Theo quy định tại Chương V
39
Ống thép mạ kẽm DN80 dày 3,2ly
150
m
Theo quy định tại Chương V
40
Cáp ngầm Cu/XLPE/PVC/DSTA/PVC 3x50+1x25mm2 - 0,6/1kV
16
m
Theo quy định tại Chương V
41
Cáp ngầm Cu/XLPE/PVC/DSTA/PVC 3x35+1x16mm2 - 0,6/1kV
10456
m
Theo quy định tại Chương V
42
Luồn cáp vào cửa cột, cửa tủ
562
Cửa
Theo quy định tại Chương V
43
Làm và lắp đặt đầu cáp lực chiếu sáng
562
Đầu
Theo quy định tại Chương V
44
Đầu cốt đồng M16
1116
Đầu
Theo quy định tại Chương V
45
Đầu cốt đồng M25
4
Đầu
Theo quy định tại Chương V
46
Đầu cốt đồng M35
1674
Đầu
Theo quy định tại Chương V
47
Đầu cốt đồng M50
12
Đầu
Theo quy định tại Chương V
48
Bảng điện cửa cột 1AT
114
Bảng
Theo quy định tại Chương V
49
Bảng điện cửa cột 2AT
165
Bảng
Theo quy định tại Chương V
50
Tiếp địa an toàn R1C
239
Bộ
Theo quy định tại Chương V

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 14: Construction, supply and installation of construction equipment". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 14: Construction, supply and installation of construction equipment" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 73

You did not use the site, Click here to remain logged. Timeout: 60 second