Invitation To Bid ( ITB, Tender Notice)

Tender package No 5: Construction work

Find: 19:17 29/11/2025
Notice Status
Published
Public procurement field
Civil Works
Name of project
Construction and installation of public lighting systems in villages 3 and 4, Thach Da commune, Me Linh district
Bidding package name
Tender package No 5: Construction work
Contractor Selection Plan ID
Name of Contractor selection plan
Planning and design for the remaining bidding packages of the project: Construction and installation of public lighting systems in villages 3 and 4 of Thach Da commune, Me Linh district
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
city budget
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
- Xã Yên Lãng, City Hà Nội
Time of bid closing
09:30 09/12/2025
Validity of bid documents
90 days
AI-classified field
AI-classified business sector
Approval ID
253/QĐ-BQLDA
Approval date
29/11/2025 19:16
Approval Authority
Ban quản lý dự án đầu tư - hạ tầng xã Yên Lãng
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
19:16 29/11/2025
to
09:30 09/12/2025
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:30 09/12/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
151.238.000 VND
Amount in words
One hundred fifty one million two hundred thirty eight thousand dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 Công ty TNHH tư vấn xây dựng 255 Technical design consultancy, construction drawing design (for two -step design works), estimates Thôn Hưng Thịnh, Xã Hội Thịnh, Tỉnh Phú Thọ, Việt Nam
2 Công ty TNHH tư vấn xây dựng PT Vĩnh Phúc Consulting on technical design verification, construction drawing design (for two -step design works), estimates Thôn Hưng Thịnh, Xã Hội Thịnh, Tỉnh Phú Thọ, Việt Nam;
3 DAVILAW PROPERTY JOINT STOCK COMPANY Consulting for setting up E-HSMT Số 59, đường Láng Hạ - - Phường Ô Chợ Dừa - Thành phố Hà Nội
4 ND TRADING AND CONSTRUCTION INVESTMENT COMPANY LIMITED E-HSMT . appraisal consulting Số 18, ngõ 141 Quan Nhân, phường Thanh Xuân, thành phố Hà Nội;
5 DAVILAW PROPERTY JOINT STOCK COMPANY E-HSDT assessment consulting Số 59, đường Láng Hạ - - Phường Ô Chợ Dừa - Thành phố Hà Nội
6 ND TRADING AND CONSTRUCTION INVESTMENT COMPANY LIMITED Consultancy on appraisal of contractor selection results Số 18, ngõ 141 Quan Nhân, phường Thanh Xuân, thành phố Hà Nội;

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Máy trộn bê tông tối thiểu 250L
1
2
Ô tô tự đổ tối thiểu 5T
1
3
Xe nâng/cẩu tự hành ≤ 12m
1

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Phá dỡ kết cấu bê tông không cốt thép bằng máy khoan bê tông 1,5kW
26.344
m3
2
Đào kênh mương, rãnh thoát nước, đường ống, đường cáp bằng thủ công, rộng <= 1m, sâu <=1m, đất cấp III
145.88
m3
3
Đắp đất nền móng công trình, nền đường
142.44
m3
4
Đổ bê tông thủ công bằng máy trộn, bê tông móng, chiều rộng <= 250 cm, đá 1x2, mác 200, PCB30
20.84
m3
5
Đào móng cột, trụ, hố kiểm tra bằng thủ công, rộng <= 1m, sâu <= 1m, đất cấp III
55.04
m3
6
Vận chuyển đất bằng ôtô tự đổ 5 tấn trong phạm vi <= 1000m, đất cấp III
0.5504
100m3
7
Vận chuyển đất bằng ô tô tự đổ 5T 1km tiếp theo trong phạm vi <= 5km, đất cấp III
0.5504
100m3/1km
8
Ván khuôn gỗ. Ván khuôn móng cột, móng vuông, chữ nhật
2.2016
100m2
9
Đổ bê tông thủ công bằng máy trộn, bê tông móng, chiều rộng <= 250 cm, đá 1x2, mác 200, PCB30
55.04
m3
10
Lắp công tơ 3 pha vào bảng đã có sẵn
9
cái
11
Lắp đặt tủ điện điều khiển chiếu sáng, độ cao của tủ điện < 2m
9
tủ
12
Lắp giá đỡ tủ điện
9
bộ
13
Lắp cần đèn D60, chiều dài cần đèn <=2,8m
563
cần đèn
14
Tay bắt cần đèn
563
bộ
15
Lắp dựng cột đèn bằng thủ công, cột bê tông chiều cao cột <=10m
86
cột
16
Đèn Led 40w
149
bộ
17
Đèn Led 75w
414
bộ
18
Lắp choá đèn ở độ cao <=12m .
563
bộ
19
Luồn dây lên đèn Cu/pvc/pvc 3x1,5mm2
19.71
100m
20
Kéo dây, cáp trên lưới đèn chiếu sáng, tiết diện 6 ÷ 50mm2
174.14
100m
21
Cáp điện CU/XLPE/PVC 4x16mm2
90
m
22
Cáp điện CU/XLPE/PVC 4x10mm2
5819
m
23
Cáp điện CU/XLPE/PVC 4x6mm2
11505
m
24
Kéo dây, cáp trên lưới đèn chiếu sáng, tiết diện 6 ÷ 25mm2
174.13
100m
25
Dây điện CU/PVC-1x6mm2
17413
m
26
Xà 0,3m
535
bộ
27
Xà 0,6m
37
bộ
28
Lắp đặt xà thủ công
572
bộ
29
Tăng đơ
1126
bộ
30
Ghíp nối
1284
cái
31
Bịt đầu cáp
340
cái
32
Dây thít inox
116
cái
33
Lắp đặt ống nhựa HDPE D32/25
1.45
100m
34
Băng dính bịt đầu khung móng
29
cái
35
Làm đầu cáp khô
34
đầu cáp
36
Lắp đặt tiếp địa cho cột điện
86
bộ
37
Lắp đặt tiếp địa lặp lại cho lưới điện cáp treo
29
bộ
38
Đánh số cột
56.3
10 cột

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 5: Construction work". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 5: Construction work" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 5

You did not use the site, Click here to remain logged. Timeout: 60 second