Invitation To Bid ( ITB, Tender Notice)

SCL power grid in Xuan Truong area in 2026

    Watching    
Find: 11:06 25/12/2025
Note: DauThau.info automatically determines that this is a bidding package only for micro and small contractors (according to the law on enterprises) participating in the bidding based on Clause 2, Article 7 of Decree No. 24/2024/NĐ-CP of the Government
Notice Status
Published
Public procurement field
Civil Works
Name of project
SCL medium and low voltage power grid in 2026
Bidding package name
SCL power grid in Xuan Truong area in 2026
Contractor Selection Plan ID
Name of Contractor selection plan
SCL medium and low voltage power grid in 2026
Spending category
Mandatory spending
Domestic/ International
Domestic
Capital source details
SCL . capital
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
Fixed unit price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
Related announcements
Time of bid closing
14:00 31/12/2025
Validity of bid documents
60 days
Approval ID
3384/QĐ-PCNB
Approval date
25/12/2025 10:45
Approval Authority
CÔNG TY ĐIỆN LỰC NINH BÌNH – CHI NHÁNH TỔNG CÔNG TY ĐIỆN LỰC MIỀN BẮC
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
11:05 25/12/2025
to
14:00 31/12/2025
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
14:00 31/12/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
61.000.000 VND
Amount in words
Sixty one million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION Technical design consultancy, construction drawing design (for two -step design works), estimates Số 09, đường Trần Hưng Đạo, phố 12, , Phường Hoa Lư, Tỉnh Ninh Bình
2 NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION Consulting on technical design verification, construction drawing design (for two -step design works), estimates Số 09, đường Trần Hưng Đạo, phố 12, , Phường Hoa Lư, Tỉnh Ninh Bình
3 NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION Valuation consulting Số 09, đường Trần Hưng Đạo, phố 12, , Phường Hoa Lư, Tỉnh Ninh Bình
4 NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION Consulting on contract performance, testing Số 09, đường Trần Hưng Đạo, phố 12, , Phường Hoa Lư, Tỉnh Ninh Bình
5 NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION Consulting for setting up E-HSMT Số 09, đường Trần Hưng Đạo, phố 12, , Phường Hoa Lư, Tỉnh Ninh Bình
6 NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION E-HSMT . appraisal consulting Số 09, đường Trần Hưng Đạo, phố 12, , Phường Hoa Lư, Tỉnh Ninh Bình
7 NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION E-HSDT assessment consulting Số 09, đường Trần Hưng Đạo, phố 12, , Phường Hoa Lư, Tỉnh Ninh Bình
8 NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION Consultancy on appraisal of contractor selection results Số 09, đường Trần Hưng Đạo, phố 12, , Phường Hoa Lư, Tỉnh Ninh Bình
9 NINH BINH POWER COMPANY BRANCH OF NORTHERN POWER CORPORATION Other consultants that these consulting services have a part directly related to the bidding package Số 09, đường Trần Hưng Đạo, phố 12, , Phường Hoa Lư, Tỉnh Ninh Bình

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Ô tô tải gắn cẩu tải trọng ≥ 5 tấn
1
2
Máy phát điện
1
3
Máy hàn điện
1
4
Máy trộn bê tông
1

List of construction items:

Form No. 01B. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Hạng mục: Sửa chữa ĐZ trung thế và các nhánh rẽ lộ 473 trạm 110 kV Giao Thủy; Lộ 474, 477 trạm 110 kV Lạc Quần - Đội QLĐL khu vực Xuân Trường
Theo quy định tại Chương V
2
Cung cấp và lắp đặt vật tư thiết bị
Theo quy định tại Chương V
3
Xà X1A
19
bộ
Theo quy định tại Chương V
4
Xà XKL2A
1
bộ
Theo quy định tại Chương V
5
Xà X2ADC
1
bộ
Theo quy định tại Chương V
6
Xà X2ANC
1
bộ
Theo quy định tại Chương V
7
Dây ACSR 50/8mm2 (có mỡ bảo vệ) (đã bao gồm 2% độ võng)
19400
m
Theo quy định tại Chương V
8
Dây ACSR 95/16mm2 (có mỡ bảo vệ) (đã bao gồm 2% độ võng)
12053
m
Theo quy định tại Chương V
9
Dây ACSR/XLPE(2,5)/HDPE-50/08mm2 (đã bao gồm 2% độ võng)
10404
m
Theo quy định tại Chương V
10
Dây ACSR-50/8 (đấu lèo)
112
m
Theo quy định tại Chương V
11
Dây ACSR-95/16 (đấu lèo)
230
m
Theo quy định tại Chương V
12
Dây AC 50/8 XLPE2.5/HDPE (đấu lèo)
134
m
Theo quy định tại Chương V
13
Dây buộc cổ sứ 1x2,5
41
m
Theo quy định tại Chương V
14
Sứ đứng gốm 22kV Pin Post+ty
593
quả
Theo quy định tại Chương V
15
Chuỗi TT néo đơn dây trần 22kV + PK: CN-TT-22
64
chuỗi
Theo quy định tại Chương V
16
Chuỗi TT néo đơn 22kV dây bọc tiết diện (70-95)mm2 + PK: CNB-TT-22-(70-95)
36
chuỗi
Theo quy định tại Chương V
17
Ghíp bọc MV IPC 70-95, vỏ cách điện dày 3-7mm; 35-70/35-95 2BL
234
bộ
Theo quy định tại Chương V
18
Kẹp cáp nhôm - nhôm dùng cho dây trần 3 bu lông: G-A50
883
bộ
Theo quy định tại Chương V
19
Giáp buộc cổ sứ đơn thẳng composite, đường kính cáp 18,5 ÷23,4mm
6
cái
Theo quy định tại Chương V
20
Tháo, lắp cách điện đứng: VHD-24 (TD)
12
quả
Theo quy định tại Chương V
21
Tháo, lắp chuỗi néo thuỷ tinh 22kV
12
chuỗi
Theo quy định tại Chương V
22
Đầu cốt đồng nhôm 1 lỗ CA50mm2
33
cái
Theo quy định tại Chương V
23
Tháo hạ thu hồi vật tư thiết bị
Theo quy định tại Chương V
24
Xà : (X1a)
19
bộ
Theo quy định tại Chương V
25
Xà : (X2adc)
1
bộ
Theo quy định tại Chương V
26
Xà : (X2anc)
1
bộ
Theo quy định tại Chương V
27
Xà : (XKra)
1
bộ
Theo quy định tại Chương V
28
Sứ đứng: (VHD22)
129
quả
Theo quy định tại Chương V
29
Sứ đứng polymer: (PPI22)
462
quả
Theo quy định tại Chương V
30
Chuỗi néo polymer: (CN22) bao gồm cả PK
101
chuỗi
Theo quy định tại Chương V
31
Dây nhôm lõi thép: (AC50)
29220
m
Theo quy định tại Chương V
32
Dây nhôm lõi thép: (AC95)
11817
m
Theo quy định tại Chương V
33
Hạng mục: Sửa chữa đường dây hạ thế sau cácTBA Xuân Nghĩa 5, 7, 8, Xuân Phú 2 - Đội QLĐL khu vực Xuân Trường
Theo quy định tại Chương V
34
Cung cấp và lắp đặt vật tư thiết bị
Theo quy định tại Chương V
35
Móng cột hạ thế MT6,5-1
56
cái
Theo quy định tại Chương V
36
Móng cột hạ thế MT6,5-3
8
cái
Theo quy định tại Chương V
37
Móng cột hạ thế MT7,5-1
12
cái
Theo quy định tại Chương V
38
Móng cột hạ thế MT7,5-3
6
cái
Theo quy định tại Chương V
39
Móng cột hạ thế MTK7,5-3
1
cái
Theo quy định tại Chương V
40
Móng cột hạ thế MT8,5-2
1
cái
Theo quy định tại Chương V
41
Phá nền bê tông
5.304
m3
Theo quy định tại Chương V
42
Cột BTLT PC.I-6.5-3.0
56
cái
Theo quy định tại Chương V
43
Cột BTLT PC.I-6.5-4.3
8
cái
Theo quy định tại Chương V
44
Cột BTLT PC.I-7.5-3.0
12
cái
Theo quy định tại Chương V
45
Cột BTLT PC.I-7.5-5.4
8
cái
Theo quy định tại Chương V
46
Cột BTLT PC.I-8.5-4.3(160)
1
cái
Theo quy định tại Chương V
47
Xà hạ thế 1 cột tròn: XĐL-41-1T
9
bộ
Theo quy định tại Chương V
48
Tiếp địa lặp lại RLL-1
21
bộ
Theo quy định tại Chương V
49
Cáp vặn xoắn 0,6/1kV-Al/XLPE-2x35 (đã bao gồm 2% độ võng)
381
m
Theo quy định tại Chương V
50
Cáp vặn xoắn 0,6/1kV-Al/XLPE-2x25 (đã bao gồm 2% độ võng)
1459
m
Theo quy định tại Chương V

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "SCL power grid in Xuan Truong area in 2026". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "SCL power grid in Xuan Truong area in 2026" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 4

You did not use the site, Click here to remain logged. Timeout: 60 second