Invitation To Bid ( ITB, Tender Notice)

Tender package No 01: Construction work

    Watching    
Find: 09:40 16/09/2024
Click to view DauThau.info's analysis (you will be deducted 2 points).
To view full information, please Login or Register
Notice Status
Published
Public procurement field
Civil Works
Name of project
Strengthening facilities, renovating and repairing to prevent deterioration at Da Trach Secondary School - Category: School yard and drainage ditch
Bidding package name
Tender package No 01: Construction work
Contractor Selection Plan ID
Spending category
Mandatory spending
Domestic/ International
Domestic
Capital source details
District budget
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Competitive Offer
Package execution location
Time of bid closing
07:30 21/09/2024
Validity of bid documents
60 days
Approval ID
158
Approval date
16/09/2024 09:36
Approval Authority
Trường THCS Dạ Trạch
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
09:38 16/09/2024
to
07:30 21/09/2024
Document Submission Fees
220.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
07:30 21/09/2024
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Commitment (In case the contractor's name on the list does not ensure credibility when participating in the bid, the form of bid security is a Letter of Guarantee or Certificate of Guarantee Insurance)
Bid security amount
9.000.000 VND
Amount in words
Nine million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Consultants Role Address
1 CÔNG TY TNHH THƯƠNG MẠI HƯNG THỊNH PHÁT HƯNG YÊN Consulting on Preparation of Finance and Technical Report Xóm 5, thôn Bình Dân - Xã Tân Dân - Huyện Khoái Châu - Tỉnh Hưng Yên
2 Công ty cổ phần Tchhome Consultancy on verification of economic and technical reports Số nhà 437 Đường Sài Thị, Thị Trấn Khoái Châu, Huyện Khoái Châu , Tỉnh Hưng Yên
3 CÔNG TY TNHH TƯ VẤN VÀ XÂY DỰNG QUANG TÙNG Consultancy on preparation and evaluation of tender documents Thôn Quanh - Thị Trấn Ân Thi - Huyện Ân Thi - Tỉnh Hưng Yên
4 CÔNG TY TNHH TƯ VẤN ĐẦU TƯ XÂY DỰNG HOÀNG MINH KHANG Evaluation of bidding documents and evaluation of contractor selection results Phố Phạm Ngũ Lão - Thị Trấn Ân Thi - Huyện Ân Thi - Tỉnh Hưng Yên

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Máy cắt bê tông
1
2
Máy cắt gạch đá
1
3
Đầm bàn
1
4
Đầm dùi
1
5
Máy trộn bê tông
1
6
Máy trộn vữa
1

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Phá dỡ kết cấu gạch đá bằng búa căn khí nén 3m3/ph
10.211
m3
2
Chặt cây ở địa hình bằng phẳng bằng máy cưa, đường kính gốc cây <= 60cm
6
cây
3
Đào gốc cây bằng thủ công, đường kính gốc <= 60cm
6
gốc cây
4
Cắt nền sân bê tông
29
10m
5
Đào đất móng băng bằng thủ công, rộng <= 3m, sâu <= 1m, đất cấp III
21.2525
m3
6
Đổ bê tông thủ công bằng máy trộn, bê tông móng, chiều rộng <= 250 cm, đá 1x2, mác 200, xi măng PCB30
10.12
m3
7
Đổ bê tông thủ công bằng máy trộn, bê tông lót móng, chiều rộng <= 250 cm, đá 4x7, mác 100, xi măng PCB30
4.768
m3
8
Xây gạch không nung 6,5x10,5x22, xây tường thẳng, chiều dày <= 11cm, chiều cao <= 6m, vữa XM mác 75, xi măng PCB30
17.0581
m3
9
Xây gạch không nung 6,5x10,5x22, xây tường thẳng, chiều dày <= 33cm, chiều cao <= 6m, vữa XM mác 75, xi măng PCB30
16.39
m3
10
Trát tường ngoài, chiều dày trát 1,5cm, vữa XMPCB30 cát mịn ML=0,7-1,4, mác 75.
241.904
m2
11
Láng nền sàn có đánh màu, dày 3cm, vữa XMPCB30 mác 75.
52.432
m2
12
Quét vôi các kết cấu - 1 nước trắng, 2 nước màu
86.83
1m2
13
Ván khuôn gỗ. Ván khuôn lanh tô, lanh tô liền mái hắt, máng nước, tấm đan
0.4542
100m2
14
Cốt thép lanh tô, lanh tô liền mái hắt máng nước, tấm đan, ô văng, đường kính cốt thép <=10mm
10.6972
100kg
15
Đổ bê tông thủ công bằng máy trộn, bê tông lanh tô, mái hắt, máng nước, tấm đan, ô văng, đá 1x2, mác 200, xi măng PCB30
9.18
m3
16
Lắp các loại cấu kiện bê tông đúc sẵn bằng thủ công, trọng lượng <= 100kg
150
1 cấu kiện
17
Xây gạch không nung 6,5x10,5x22, xây tường thẳng, chiều dày <= 11cm, chiều cao <= 6m, vữa XM mác 75, xi măng PCB30
0.7485
m3
18
Ván khuôn gỗ. Ván khuôn lanh tô, lanh tô liền mái hắt, máng nước, tấm đan
0.0682
100m2
19
Cốt thép lanh tô, lanh tô liền mái hắt máng nước, tấm đan, ô văng, đường kính cốt thép <=10mm
1.3224
100kg
20
Đổ bê tông thủ công bằng máy trộn, bê tông lanh tô, mái hắt, máng nước, tấm đan, ô văng, đá 1x2, mác 200, xi măng PCB30
1.224
m3
21
Lắp các loại cấu kiện bê tông đúc sẵn bằng thủ công, trọng lượng <= 100kg
24
1 cấu kiện
22
Trát tường ngoài, chiều dày trát 1,5cm, vữa XMPCB30 cát mịn ML=0,7-1,4, mác 75.
56.0136
m2
23
Lát nền, sàn, kích thước gạch 500x500, vữa XMPCB30 mác 75.
22.116
m2
24
Đắp cát công trình bằng máy lu bánh thép 9T, độ chặt yêu cầu K=0,95
5.3119
100m3
25
Rải ni lông lớp cách ly
11.353
100m2
26
Đổ bê tông thủ công bằng máy trộn, bê tông nền, đá 1x2, mác 200, xi măng PCB30
147.589
m3
27
Cắt khe 1x4 của đường lăn, sân đỗ
19
10m
28
Lát nền sân bằng gạch Terrazzo KT 400x400, vữa XMPCB30 mác 75.
565
m2

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 01: Construction work". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 01: Construction work" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 10

You did not use the site, Click here to remain logged. Timeout: 60 second