Invitation To Bid ( ITB, Tender Notice)

Tender package No 01: Construction work

Find: 14:51 23/06/2025
Notice Status
Published
Public procurement field
Civil Works
Name of project
Repairing and supplementing the signaling system on Uong rivers, shortcuts, rivers and Ha Long Bay in 2025
Bidding package name
Tender package No 01: Construction work
Contractor Selection Plan ID
Name of Contractor selection plan
Repairing and supplementing the signaling system on Uong rivers, shortcuts, rivers and Ha Long Bay in 2025
Spending category
Investment and Development Spending
Domestic/ International
Domestic
Capital source details
Provincial budget for waterway maintenance
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
Fixed unit price
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
Time of bid closing
09:00 04/07/2025
Validity of bid documents
90 days
Approval ID
E2500267466_2506231115
Approval date
23/06/2025 11:23
Approval Authority
Sở Xây dựng tỉnh Quảng Ninh
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
14:49 23/06/2025
to
09:00 04/07/2025
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
09:00 04/07/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Estimated Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
129.000.000 VND
Amount in words
One hundred twenty nine million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 SONG TICH CONSTRUCTION ENGINEERING TRADING INVESTMENT COMPANY LIMITED Consulting, surveying, making economic - technical reports Số 51/38 An Đà, phường Lạch Tray, quận Ngô Quyền, thành phố Hải Phòng

Renewal information

# Time to Renew Successfully Old bid closing time Time of bid closing after extension Old bid opening time Bid opening time after extension Reason
1 16:44 01/07/2025 09:00 02/07/2025 09:00 04/07/2025 09:00 02/07/2025 09:00 04/07/2025 Ensure the response time to clarify the Bidding Documents "minimum of 02 working days before the bidding time" as prescribed at Point c, Clause 2, Article 26 of Decree No. 24/2024/ND-CP dated February 27, 2024

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Tàu công tác ≥ 33CV
1
2
Sà lan ≥ 400 tấn
1
3
Tàu kéo ≥ 250CV
1
4
Cần cẩu bánh xích ≥ 16 tấn
1

List of construction items:

Form No. 01B. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
Luồng sông Uông
Theo quy định tại Chương V
2
Thay đèn báo hiệu
2
bộ
Theo quy định tại Chương V
3
Trục phao báo hiệu
1
quả
Theo quy định tại Chương V
4
Phao báo hiệu D = 1,4m
Theo quy định tại Chương V
5
Thép tấm
1059.7409
kg
Theo quy định tại Chương V
6
Thép tròn
72.8979
kg
Theo quy định tại Chương V
7
Bu lông M20x50
16
bộ
Theo quy định tại Chương V
8
Bu lông M20x220
12
bộ
Theo quy định tại Chương V
9
Bu lông M14x50
4
bộ
Theo quy định tại Chương V
10
Gioăng cao su
0.5776
m2
Theo quy định tại Chương V
11
Sơn chống rỉ 1 nước lót, 2 nước chống rỉ
28.66
m2
Theo quy định tại Chương V
12
Sơn màu 2 lớp
17.33
m2
Theo quy định tại Chương V
13
Sơn chống hà
13.23
m2
Theo quy định tại Chương V
14
Bê tông đối trọng phao M250
0.0653
m3
Theo quy định tại Chương V
15
Thép bản
44.9598
kg
Theo quy định tại Chương V
16
Thép hình
12.1125
kg
Theo quy định tại Chương V
17
Giá đèn
Theo quy định tại Chương V
18
Thép tấm
34.383
kg
Theo quy định tại Chương V
19
Thép hình
40.8668
kg
Theo quy định tại Chương V
20
Thép tròn
15.3634
kg
Theo quy định tại Chương V
21
Bu lông M16x50
12
bộ
Theo quy định tại Chương V
22
Sơn chống rỉ 1 nước lót, 2 nước chống rỉ
4.5
m2
Theo quy định tại Chương V
23
Sơn màu 2 lớp
4.5
m2
Theo quy định tại Chương V
24
Lồng đèn, tiêu thị
Theo quy định tại Chương V
25
Thép tròn
2.2977
kg
Theo quy định tại Chương V
26
Thép tấm
9.2774
kg
Theo quy định tại Chương V
27
Bu lông M14x50
3
bộ
Theo quy định tại Chương V
28
Sơn chống rỉ 1 nước lót, 2 nước chống rỉ
0.31
m2
Theo quy định tại Chương V
29
Sơn màu 2 lớp
0.31
m2
Theo quy định tại Chương V
30
Bốc xếp, vận chuyển phao đủ bộ (đường bộ) cự ly trung bình 5km
1
toàn bộ
Theo quy định tại Chương V
31
Bốc xếp, vận chuyển phao đủ bộ (đường thủy) cự ly trung bình 1km
1
toàn bộ
Theo quy định tại Chương V
32
Thả phao
1
quả
Theo quy định tại Chương V
33
Lắp đặt lồng đèn, tiêu thị
1
cái
Theo quy định tại Chương V
34
Cột báo hiệu, biển báo hiệu
Theo quy định tại Chương V
35
Thu hồi cột báo hiệu
4
cái
Theo quy định tại Chương V
36
Gia công cột báo hiệu
0.5549
tấn
Theo quy định tại Chương V
37
Gia công biển báo hiệu
1.2087
tấn
Theo quy định tại Chương V
38
Bulong M14
78
cái
Theo quy định tại Chương V
39
Gia công lồng bảo vệ đèn
6
cái
Theo quy định tại Chương V
40
Lắp đặt biển báo hiệu
33
cái
Theo quy định tại Chương V
41
Lắp đặt cột báo hiệu
6
cái
Theo quy định tại Chương V
42
Lắp đặt thang sắt
0.0315
tấn
Theo quy định tại Chương V
43
Đèn báo hiệu
9
cái
Theo quy định tại Chương V
44
Sơn chống rỉ
95.96
m2
Theo quy định tại Chương V
45
Sơn màu báo hiệu
95.96
m2
Theo quy định tại Chương V
46
Ván khuôn móng cột
1.088
100m2
Theo quy định tại Chương V
47
Bê tông móng cột M200
8.4
m3
Theo quy định tại Chương V
48
Cốt thép cột bê tông D ≤ 18mm
0.0435
tấn
Theo quy định tại Chương V
49
Cốt thép cột bê tông D ≤ 10mm
0.0165
tấn
Theo quy định tại Chương V
50
Ván khuôn cột
0.0395
100m2
Theo quy định tại Chương V

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors Ban Quản lý bảo trì công trình tỉnh Quảng Ninh as follows:

  • Has relationships with 185 contractor.
  • The average number of contractors participating in each bidding package is: 1.64 contractors.
  • Proportion of bidding fields: Goods 0.32%, Construction 79.10%, Consulting 17.04%, Non-consulting 3.54%, Mixed 0.00%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 2,705,865,236,986 VND, in which the total winning value is: 2,670,168,934,471 VND.
  • The savings rate is: 1.32%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 01: Construction work". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 01: Construction work" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 28

You did not use the site, Click here to remain logged. Timeout: 60 second