Invitation To Bid ( ITB, Tender Notice)

Tender package No 03: Construction work

    Watching    
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 15:06 13/01/2026
Note: DauThau.info automatically determines that this is a bidding package only for micro and small contractors (according to the law on enterprises) participating in the bidding based on Clause 2, Article 7 of Decree No. 24/2024/NĐ-CP of the Government
Notice Status
Published
Public procurement field
Civil Works
Name of project
Project: Cai Tat sluice, Category: Repair of embankment upstream and downstream of sluice (Repair of embankment of right bank downstream of sluice)
Bidding package name
Tender package No 03: Construction work
Contractor Selection Plan ID
Name of Contractor selection plan
Project contractor selection plan: Cai Tat Culvert, Category: Repair of embankment upstream and downstream of the culvert (Repair of embankment on the right bank downstream of the culvert)
Spending category
Other
Domestic/ International
Domestic
Capital source details
Irrigation service sources in 2024 and 2025
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Open bidding
Contract Execution location
- Phường An Hải, City Hải Phòng
Time of bid closing
15:30 22/01/2026
Validity of bid documents
60 days
Approval ID
11/QĐ-TLA
Approval date
13/01/2026 15:03
Approval Authority
CÔNG TY TNHH MỘT THÀNH VIÊN KHAI THÁC CÔNG TRÌNH THUỶ LỢI AN HẢI
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
15:05 13/01/2026
to
15:30 22/01/2026
Document Submission Fees
330.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
15:30 22/01/2026
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Notice type
Guarantee letter or guarantee insurance certificate
Bid security amount
54.000.000 VND
Amount in words
Fifty four million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 CAT TIEN SA CONSULTANS CONSTRUCTION JOINT STOCK COMPANY Technical design consultancy, construction drawing design (for two -step design works), estimates Số 02/65 đường Đẩu Vũ - - Phường Phù Liễn - Thành phố Hải Phòng
2 HOP THANH KC JOINT STOCK COMPANY Consulting on technical design verification, construction drawing design (for two -step design works), estimates Số 156/109 Trường Chinh, cụm Công Nghiệp Đồng Hoà - - Phường Kiến An - Thành phố Hải Phòng
3 BAC SONG CAM INVESTMENT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY Consulting for setting up E-HSMT Khu Cầu Đen - - Phường Thuỷ Nguyên - Thành phố Hải Phòng
4 HAIPHONG CONSTRUCTION DESIGN AND CONSULTANT JOINT STOCK COMPANY E-HSMT . appraisal consulting Số 36 Lý Tự Trọng - - Phường Hồng Bàng - Thành phố Hải Phòng
5 BAC SONG CAM INVESTMENT CONSULTING AND CONSTRUCTION JOINT STOCK COMPANY E-HSDT assessment consulting Khu Cầu Đen - - Phường Thuỷ Nguyên - Thành phố Hải Phòng
6 HAIPHONG CONSTRUCTION DESIGN AND CONSULTANT JOINT STOCK COMPANY Consultancy on appraisal of contractor selection results Số 36 Lý Tự Trọng - - Phường Hồng Bàng - Thành phố Hải Phòng

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Búa căn khí nén ≥ 3,0 m3/ph
1
2
Cần cẩu bánh hơi ≥ 6 T
1
3
Máy cắt uốn cốt thép ≥ 5,0 kW
1
4
Máy đào ≤ 1,25 m3 gắn đầu búa thủy lực / hàm kẹp
1
5
Máy đào 0,65 m3~ 1,25m3
1
6
Đầm dùi ≥ 1,5 kW
1
7
Máy đầm đất cầm tay ≥ 50 kg
1
8
Máy hàn xoay chiều ≥23,0 kW
1
9
Máy khoan đứng ≥ 2,5 kW
1
10
Máy mài ≥ 2,7 kW
1
11
Máy nén khí ≥ 360,00 m3/h
1
12
Máy trộn bê tông ≥ 250,0 lít
1
13
Ô tô vận tải thùng ≤ 7,0 T
1
14
Pông tông (phao thép hoặc xà lan)
2
15
Cần trục ô tô ≤ 10T
1
16
Rơ mooc ≤ 40,0 T
1
17
Ô tô đầu kéo ≥ 150,0 CV
1

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
HẠNG MỤC: SỬA CHỮA KÈ THƯỢNG VÀ HẠ LƯU CỐNG
2
PHẦN ĐẤT
3
Đất núi để đắp
414.214
m3
4
Đào xúc đất núi quăng 2 lần vào mái kè bằng máy đào 1,25m3
4.142
100m3
5
Đắp mái kè bằng máy đào có dung tích gầu 0,65m3, 1 máy đào kết hợp máy đầm đất cầm tay - độ chặt yêu cầu K=0,90
3.231
100m3
6
PHÁ DỠ KÈ CŨ
7
Phá dỡ kết cấu bê tông có cốt thép bằng búa căn khí nén 3m3/ph
20.124
m3
8
Phá dỡ kết cấu gạch đá bằng búa căn khí nén 3m3/ph
144.95
m3
9
Đắp gia cố chân kè tận dụng vật liệu phá dỡ
172.25
m3
10
CỌC BÊ TÔNG ĐÚC SẴN
11
Công tác gia công, lắp đặt cốt thép bê tông đúc sẵn. Cốt thép cọc, đường kính <= 10mm
6.56
tấn
12
Công tác gia công, lắp đặt cốt thép bê tông đúc sẵn. Cốt thép cọc, đường kính <= 18mm
18.59
tấn
13
Gia công cấu kiện thép đặt sẵn trong bê tông, khối lượng một cấu kiện <= 20 kg
6.74
tấn
14
Lắp đặt cấu kiện thép đặt sẵn trong bê tông, khối lượng một cấu kiện <= 20 kg
6.74
tấn
15
Đổ bê tông đúc sẵn bằng thủ công - sản xuất bằng máy trộn. Bê tông cọc, đá 1x2, mác 300, PCB40
205.99
m3
16
Công tác gia công, lắp dựng, tháo dỡ ván khuôn. Ván khuôn thép, ván khuôn cọc
17.55
100m2
17
Bốc xếp cấu kiện bê tông đúc sãn (L=8,0m) trọng lượng <= 2T bằng cần cẩu - bốc xếp từ bãi đúc lên ô tô
407
cấu kiện
18
Bốc xếp cấu kiện bê tông đúc sãn (L=6,3) trọng lượng <= 1 tấn bằng cần cẩu - bốc xếp từ ô tô xuống bãi tập kết
16
cấu kiện
19
Vận chuyển cọc bê tông bằng ô tô 7T, cự ly vận chuyển <= 1km
51.5
10 tấn/1km
20
Vận chuyển cọc, cột bê tông bằng ô tô 7T, cự ly vận chuyển 3.0km tiếp theo
51.5
10 tấn/1km
21
Bốc xếp cấu kiện bê tông đúc sãn (L = 8,0m) trọng lượng <= 2T bằng cần cẩu - bốc xếp từ ô tô xuống tường quặt
407
cấu kiện
22
Bốc xếp cấu kiện bê tông đúc sãn (L = 6,0m) trọng lượng <= 1 tấn bằng cần cẩu - bốc xếp từ ô tô xuống tường quặt
16
cấu kiện
23
Bốc xếp cấu kiện bê tông đúc sãn (L=8,0m) trọng lượng <= 2T bằng bằng máy đào 0.8m3 từ tường quặt lên phao thép
407
cấu kiện
24
Bốc xếp cấu kiện bê tông đúc sãn (l=6,0m) trọng lượng <= 1tấn bằng máy đào 0.8m3 từ tường quặt lên phao thép
16
cấu kiện
25
Đóng cọc bê tông cốt thép dưới nước bằng máy đào có gắn đầu búa thủy lực, chiều dài cọc <= 24m, kích thước cọc 25x25cm (phần cọc không ngập đất)
4.1573
100m
26
Đóng cọc bê tông cốt thép dưới nước bằng máy đào có gắn đầu búa thủy lực, chiều dài cọc <= 24m, kích thước cọc 25x25cm (phần cọc ngập đất)
29.4107
100m
27
Đập đầu cọc bê tông các loại bằng búa căn khí nén 3m3/ph, dưới nước
7.9313
m3
28
Đóng cọc thép hình (thép U, I) dưới nước bằng máy đào 1.25m3 gắn đầu búa thủy lực, chiều dài cọc <= 10m, đất cấp I (phần không ngập đất)
0.7
100m
29
Đóng cọc thép hình (thép U, I) dưới nước bằng máy đào 1.25m3 gắn đầu búa thủy lực, chiều dài cọc <= 10m, đất cấp I (phần ngập đất)
0.9
100m
30
Nhổ cọc thép hình, cọc ống thép bằng cần cẩu 25T, dưới nước
0.9
100m cọc
31
GIA CỐ MÁI
32
Đổ bê tông thủ công bằng máy trộn, bê tông lót móng, chiều rộng <= 250 cm, đá 2x4, vữa mác 100, PCB30
10.84
m3
33
Bê tông giằng khung mái, đá 1x2 M300, PCB40
43.51
m3
34
Công tác gia công lắp dựng cốt thép. Cốt thép giằng khung mái kè, đường kính cốt thép <= 10mm, chiều cao <= 6m
0.63
tấn
35
Công tác gia công lắp dựng cốt thép. Cốt thép giằng khung mái kè, đường kính cốt thép <= 18mm, chiều cao <= 6m
2.07
tấn
36
Ván khuôn thép, khung xương thép, cột chống bằng thép ống. Ván khuôn giằng khung mái kè, chiều cao <= 28m
2.94
100m2
37
Đổ bê tông đúc sẵn tấm lát mái kè, đá 1x2, mác 250, PCB40
60.67
m3
38
Đổ bê tông đổ bù mái kè, đá 1x2, mác 250, PCB40
9.4891
m3
39
Công tác gia công, lắp đặt cốt thép bê tông đúc sẵn. Cốt thép tấm lát mái kè
0.2157
tấn
40
Công tác gia công, lắp dựng, tháo dỡ ván khuôn. Ván khuôn thép, ván khuôn tấm lát mái kè
10.8303
100m2
41
Bốc xếp cấu kiện tấm lát mái kè đúc sãn trọng lượng <= 200kg bằng cần cẩu - bốc xếp từ bãi đúc lên ô tô
2370
cấu kiện
42
Vận chuyển cấu kiện tấm lát mái kè bằng ô tô 7T, cự ly vận chuyển <= 1km
15.17
10 tấn/1km
43
Vận chuyển cấu kiện tấm lát mái kè bằng ô tô 7T, cự ly vận chuyển 3km tiếp theo
15.17
10 tấn/1km
44
Bốc xếp cấu kiện tấm lát mái kè đúc sãn trọng lượng <= 200kg bằng cần cẩu- bốc xếp từ ô tô xuống vị trí bãi chứa
2370
cấu kiện
45
Rải vải địa kỹ thuật làm nền đường, mái đê, đập
6.259
100m2
46
Rải đá dăm lót thi công kè bằng thủ công
50.55
m3
47
Bốc xếp và vận chuyển tấm lát mái 8 khoang cuối bằng thủ công, trọng lượng <= 100kg
11.264
tấn
48
Vận chuyển bằng thủ công 10m khởi điểm - cấu kiện bê tông đúc sẵn trọng lượng <= 100kg
11.264
tấn
49
Vận chuyển bằng thủ công 60m tiếp theo - cấu kiện bê tông đúc sẵn trọng lượng <= 100kg
11.264
tấn
50
Lắp ghép các tấm bê tông định hình lát mái kè loại không có ngàm trên cạn, trọng lượng tấm bê tông > 50kg
2370
tấm

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 03: Construction work". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 03: Construction work" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 2

You did not use the site, Click here to remain logged. Timeout: 60 second