Invitation To Bid ( ITB, Tender Notice)

Tender package No 04: Construction work

    Watching    
Find: 14:42 30/06/2025
Note: DauThau.info automatically determines that this is a bidding package only for micro and small contractors (according to the law on enterprises) participating in the bidding based on Clause 2, Article 7 of Decree No. 24/2024/NĐ-CP of the Government
Notice Status
Published
Public procurement field
Civil Works
Name of project
Multi -purpose home repair of Bac Giang College
Bidding package name
Tender package No 04: Construction work
Contractor Selection Plan ID
Name of Contractor selection plan
Multi -purpose home repair of Bac Giang College
Spending category
Mandatory spending
Domestic/ International
Domestic
Capital source details
State budget in 2025
Range
Within the scope of the Law on Bidding
Contractor selection method
Single Stage Single Envelope
Contract Type
All in One
Contract Period
To view full information, please Login or Register
Contractor selection methods
Competitive Offer
Contract Execution location (After merge)
Contract Execution location (Before merge)
Time of bid closing
15:00 05/07/2025
Validity of bid documents
90 days
Approval ID
E2500300441_2506301434
Approval date
30/06/2025 14:34
Approval Authority
TRƯỜNG CAO ĐẲNG BẮC GIANG
Approval Documents

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files. To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

Participating in tenders

Bidding form
Online
Tender documents submission start from
14:40 30/06/2025
to
15:00 05/07/2025
Document Submission Fees
220.000 VND
Location for receiving E-Bids
To view full information, please Login or Register

Bid award

Bid opening time
15:00 05/07/2025
Bid opening location
https://muasamcong.mpi.gov.vn
Price Tender value
To view full information, please Login or Register
Amount in text format
To view full information, please Login or Register
Bid Opening Result
See details here . If you want to receive automatic bid opening notification via email, please upgrade your VIP1 account .
Bid award
See details here . If you want to receive automatic contractor selection results via email, please upgrade your VIP1 account .

Bid Security

Notice type
Commitment (In case the contractor is named in the list that does not guarantee the prestige when participating in the bid, the bid assurance form is a guarantee letter or a certificate of guarantee insurance)
Bid security amount
25.000.000 VND
Amount in words
Twenty five million dong

Tender Invitation Information

Bidding documents on the Public Procurement System may be infected with viruses or errors, some files require computers using Windows operating systems and need to install Client Agent software (Linux and MacOS operating systems cannot install Client software) to be able to download. Using DauThau.info software, you can check all the above problems as well as preview the total size of the bidding documents to prevent missing files from downloading.
Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611

List of consulting units who have participated in the package

# Unit name Role Address
1 TIEN THANG CONSTRUCTION AND CONSULTING JOINT STOCK COMPANY Technical design consultancy, construction drawing design (for two -step design works), estimates Số 236 Thân Nhân Trung - Phường Mỹ Độ - Thành phố Bắc Giang - Tỉnh Bắc Giang
2 CÔNG TY CỔ PHẦN PHÚ HƯNG 668 BG Consulting for setting up E-HSMT Số 5, Đường Hùng Vương - Phường Ngô Quyền - Thành phố Bắc Giang - Tỉnh Bắc Giang
3 CÔNG TY CỔ PHẦN PHÚ HƯNG 668 BG E-HSDT assessment consulting Số 5, Đường Hùng Vương - Phường Ngô Quyền - Thành phố Bắc Giang - Tỉnh Bắc Giang
4 AN PHAT CONSTRUCTION CONSULTANCY AND TRADING SERVICE COMPANY LIMITED Project management consultancy, contract management of investors, bid solicitors or investors, bid solicitors Số 338 đường Mỹ Độ, thôn Mỹ Cầu - Xã Tân Mỹ - Thành phố Bắc Giang - Tỉnh Bắc Giang

Requirements for main construction equipment

Number Type of device and device characteristics Minimum quantity required
1
Máy cắt gạch đá
1
2
Máy cắt uốn cốt thép
1
3
Máy hàn điện
1
4
Máy khoan bê tông
1
5
Máy trộn vữa
1
6
Ô tô tự đổ
1

List of construction items:

Form No. 01A. Bill of Quantities:

Number Job Description Bidding Amount Calculation Unit Technical requirements/Main technical instructions Note
1
PHẦN PHÁ DỠ
2
Tháo dỡ cửa
247.4604
m2
3
Tháo dỡ khuôn cửa đơn
215.66
m
4
Phá lớp vữa trát tường, cột, trụ
61.27
m2
5
Tháo dỡ sen hoa cửa sổ, cửa đi
53.4912
m2
6
Phá dỡ nền - Nền láng vữa xi măng
78.1114
m2
7
Phá dỡ nền gạch xi măng, gạch gốm các loại
263.9197
m2
8
Tháo dỡ gạch ốp chân tường
71.86
m2
9
Tháo dỡ kết cấu sắt thép, chiều cao ≤6m
0.1662
tấn
10
Tháo dỡ vách ngăn ván sàn
82.46
m2
11
Tháo dỡ mái tôn, chiều cao ≤28m
684.6861
m2
12
Phá lớp vữa trát tường, cột, trụ
94.7265
m2
13
Phá dỡ nền - Nền láng vữa xi măng
78.4208
m2
14
Tháo dỡ kết cấu sắt thép, chiều cao ≤6m
0.106
tấn
15
Tháo dỡ tấm lợp - Tôn
0.139
100m2
16
Lắp dựng, tháo dỡ dàn giáo ngoài, chiều cao ≤16m
12.285
100m2
17
Cạo bỏ lớp vôi, sơn cũ trên bề mặt - tường, trụ, cột ( tính bằng 50% diện tích sơn tường ngoài nhà)
416.4343
m2
18
Cạo bỏ lớp vôi, sơn cũ trên bề mặt - xà dầm, trần (tính bằng 50% diện tích sơn dầm trần ngoài nhà)
152.3344
m2
19
Lắp dựng, tháo dỡ dàn giáo trong có chiều cao >3,6m - Chiều cao chuẩn 3,6m
1.2374
100m2
20
Lắp dựng, tháo dỡ dàn giáo trong có chiều cao >3,6m - Mỗi 1,2m tăng thêm
1.2374
100m2
21
Lắp dựng, tháo dỡ dàn giáo trong có chiều cao >3,6m - Chiều cao chuẩn 3,6m
0.819
100m2
22
Lắp dựng, tháo dỡ dàn giáo trong có chiều cao >3,6m - Mỗi 1,2m tăng thêm
0.819
100m2
23
Cạo bỏ lớp vôi, sơn cũ trên bề mặt - tường, trụ, cột ( tính bằng 50% diện tích sơn tường trong nhà)
511.9135
m2
24
Cạo bỏ lớp vôi, sơn cũ trên bề mặt - xà dầm, trần (tính bằng 50% diện tích sơn dầm trần trong nhà)
151.1576
m2
25
Cạo bỏ lớp vôi, sơn cũ trên bề mặt - kim loại
51.9742
m2
26
Vận chuyển đất bằng ô tô tự đổ
4.5551
10m³/1km
27
PHẦN CỬA THAY MỚI
28
Cửa đi mở quay hệ 55, khung bao và khung cánh nhôm dày 2mm (kính dán an toàn dày 6,38mm) ( đã bao gồm khuôn cửa, lắp đặt hoàn thiện tại công trình; phụ kiện tính riêng theo từng loại cửa tương ứng)
54.615
m2
29
Bộ phụ kiện cửa đi mở quay 4 cánh (gồm: 12 bản lề 3D, taynắm+ khóa đơn điểm, 03 bộ chốt trên+ dưới)
6
bộ
30
Bộ phụ kiện cửa đi mở quay 1 cánh (gồm: 03 bản lề 3D, taynắm+ khóa đơn điểm)
7
bộ
31
Bộ phụ kiện cửa đi mở quay 2 cánh (gồm: 06 bản lề 3D, taynắm+ khóa đơn điểm)
1
bộ
32
Cửa sổ mở quay, mở hất, mở trượt lùa hệ 55 khung bao và khung nhôm dày 1,4mm, kính an toàn dày 6,38 mm ( đã bao gồm khuôn cửa, lắp đặt hoàn thiện tại công trình; phụ kiện tính riêng theo từng loại cửa tương ứng)
109.436
m2
33
Bộ phụ kiện cửa sổ mở quay, mở hất 4 cánh (gồm: bản lề chữ A, khóa tay nắm đa điểm, thanh cài)
16
bộ
34
Bộ phụ kiện cửa sổ mở quay, mở hất 2 cánh (gồm: bản lề chữA, khóa tay nắm đơn điểm, thanh cài)
9
bộ
35
Bộ phụ kiện cửa sổ mở trượt 2 cánh (gồm: bánh xe, chốt sập,khóa đơn điểm, tay nắm):
36
bộ
36
Bộ phụ kiện cửa sổ mở quay, mở hất 1 cánh (gồm: bản lề chữ A, khóa tay nắm đơn điểm, thanh cài)
6
bộ
37
Vách kính cố định hệ 55, nhôm dày 2mm, kính dán an toàn dày 6,38mm:
6.885
m2
38
Vách kính cố định hệ 55, nhôm dày 2mm, kính dán an toàn dày 6,38mm:
92.104
m2
39
Gia công hệ thép hộp đỡ vách kính
0.8365
tấn
40
Nở sắt (bật thép) M14x150mm
240
cái
41
Lắp dựng hệ khung thép hộp đỡ vách kính
0.8365
tấn
42
Sơn sắt thép bằng sơn các loại 1 nước lót + 2 nước phủ
53.28
1m2
43
Hộp inox 304 kích thước 20x20x1,5mm.(Đã bao gồm chi phí gia công, vận chuyển, lắp dựng hoàn chỉnh tại công trình)
582.3468
kg
44
PHẦN SỬA CHỮA MÁI
45
Gia công vì kèo thép hình khẩu độ nhỏ, khẩu độ ≤9m
0.4442
tấn
46
Lắp vì kèo thép khẩu độ ≤18m
0.4442
tấn
47
Gia công xà gồ thép
0.5456
tấn
48
Lắp dựng xà gồ thép
0.5456
tấn
49
Nở sắt M12x150mm
120
cái
50
Xây tường thẳng bằng gạch BTKN 6,0x10,5x22cm - Chiều dày ≤11cm, chiều cao ≤6m, vữa XM M75, PCB40
3.5767
m3

Bidding party analysis

Data analysis results of DauThau.info software for bid solicitors CÔNG TY CỔ PHẦN PHÚ HƯNG 668 BG as follows:

  • Has relationships with 39 contractor.
  • The average number of contractors participating in each bidding package is: 1.52 contractors.
  • Proportion of bidding fields: Goods 0.00%, Construction 88.57%, Consulting 8.57%, Non-consulting 2.86%, Mixed 0.00%, Other 0%.
  • The total value according to the bidding package with valid IMP is: 78,254,529,000 VND, in which the total winning value is: 74,508,346,000 VND.
  • The savings rate is: 4.79%.
DauThau.info software reads from national bidding database

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 04: Construction work". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 04: Construction work" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 14

You did not use the site, Click here to remain logged. Timeout: 60 second