Invitation To Bid ( ITB, Tender Notice)

Tender package No 1: Construction work

    Watching  
Find: 14:56 25/10/2018
Notice Status
Posted for the first time
Notify Area
Civil Works
Name of project
Repairing communal cultural houses, working offices and exterior items Dong Tuyen Commune People's Committee
Name of Tender Notice
Tender package No 1: Construction work
Contractor Selection Plan ID
Spending Category
Investment and Development Project
Funding source
Exceeding the collection of land use fees
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
National competitive bidding
Package execution location
Time of bid closing
09:00 10/11/2018

Main content

* Cultural house: - Closed with 0.35ly thick corrugated iron ceiling, L50x5 steel frame combined with L50x3 and 12x12 solid steel anchor, 50x50x2 box steel ceiling beams; - Sanding, plastering and repainting the inside of the walls: - Replace doors D2, D3, broken aluminum and glass with steel box 30x60x1.5, white glass 5ly thick; replace the old fixed aluminum and glass S2 door with 25x50 aluminum frame glass shutters, 5ly thick white glass; * Rehab house; Workhouse 2A; Workhouse 2B; Level 4 working house. - Replace the old corrugated iron roof with 11 wave square wave insulation soundproof corrugated iron; - Shave and plaster the ceiling and walls of the Wc area and at the same time use waterproofing of the toilet roof; - Re-paved the front yard steps, warehouse floor with 500x500 joint venture bricks; - Scrape and repaint all windows, doors, iron flowers with 1 layer of anti-rust 2 layers of color; - Replace the electricity and water supply system for the house. * Auxiliary items: - Building a stone embankment to block the ground and create a planting area in front of the office, the outside is covered with natural granite, on the box steel railing and some other items.

Participating in tenders

Bidding method
picture_thuc_nhan_hs
Tender documents start selling in
08:00 31/10/2018
to
09:00 10/11/2018
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
1.000.000 VND

Bid award

Award date
10:00 10/11/2018
Price Tender value
The estimate of the bidding package is not published in the Tender Notice (including the Tender Notice published in the bidding newspaper and the Tender Notice published in the public procurement system/national procurement network). Only DauThau.info has the exclusive feature of "scanning" the bid package price. To check the exact price of the software package, please register for one of the VIP software packages (VIP1, VIP2, VIP3...) .
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Type
Letter of credit or deposit by check
Amount of money
25.000.000 VND
Amount in text format
Twenty five million dong

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "Tender package No 1: Construction work". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "Tender package No 1: Construction work" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 52

You did not use the site, Click here to remain logged. Timeout: 60 second