Invitation To Bid ( ITB, Tender Notice)

The entire volume of construction work

    Watching  
Find: 12:05 04/11/2019
Ghi chú: Gói thầu chỉ dành cho nhà thầu cấp siêu nhỏ, nhỏ (theo quy định của pháp luật doanh nghiệp) tham gia đấu thầu
Notice Status
Posted for the first time
Notify Area
Civil Works
Name of project
BTXM route from Thanh Giang (Nhon Phong) to Trung Dinh (Nhon An); (Starting point: Thanh Giang junction - End point: Trung Dinh)
Name of Tender Notice
The entire volume of construction work
Investor
UBND xã Nhơn Phong
Contractor Selection Plan ID
Name of Contractor selection plan
The entire volume of construction work
Spending Category
Investment and Development Project
Funding source
Cement province support, Nhon Phong commune budget and mobilize other legal capital sources (if any)
Range
Within the scope of the Law on Bidding
Method
Single Stage Single Envelope
Contract Period
To view full information, please Login or Register
Contractor selection methods
National Competitive Bidding
Contract Execution location
Time of bid closing
14:00 18/11/2019
AI-classified field

Main content

Length of upgraded and expanded section: L = 911.28m. Road surface width: Bm = 3.5m÷4.5m; Width of roadbed: 5.0m. Horizontal slope of road surface: face = 2%. Sidewalk horizontal slope: side = 4%. The embankment talus roof: m = 1:1. Roof talus of the excavated road foundation: m = 1:1; - Drainage system: Connect 1.0m of D800mm sluice upstream at pile D3=CONG D80 for Km0+14.90. New construction of head wall and wing wall and sluice yard at upstream side. Connect two culverts D600mm, each segment has a length of L=1.0m in the upstream and downstream of the culvert at pile C10=CONG D60 for Km0+201.40. New construction of head wall and wing wall and reinforcement of terrace downstream of culvert. Keep the old culvert D600mm, L=5.0m, at pile C15=CONG D60, process Km0+412.26. New construction of head wall, wing wall and terrace downstream of culvert. New construction of culverts with dimensions (bxh=0.5x1,0)m, L=5m at pile D14, explanation Km0+492.87. Connect the D200mm sluice at upstream and downstream by 02 sluices of kt village (bxh=0.3x0.3)m, L=1.4m at pile C29=CONG D20, with the length of km0+747.76. New construction of sluice gate D600, L=6.0m at pile C36=CONG D60, reason Km0+894.41. Dig back irrigation ditches and combine drainage on both sides of the route with trapezoidal cross-section, bottom width B=1.0m, total length L=268.20m; - Reinforcement of talus roof on both sides of the spillway: From DAUTRAN pile (km0+136.90) to pile D6=CUOITRAN (km0+232.06), L=95.16m. * Structure: Road surface: M250 layer of BTXM road surface, 2x4 stone, 20cm thick. Silver plastic nail lining. Expansion joints with asphalt mastic. Roadbed: Filling with soil and gravel hill, compacting K95. - Drainage system: D600mm and D800mm culverts are structured as follows: + The footing of the culvert yard is made of 4x6 stone. + The culvert yard, the foot of the tray is built of stone and cement mortar M100. + Wing wall and culvert wall are built of M100 cement mortar. - The culvert sizes (bxh=0.5x1,0)m and (bxh=0.3x0.3)m are structured as follows: + The footing of the culvert yard is made of 4x6 stone. + Foundation, body wall, wing wall and culvert yard are made of 2x4 M200 stone BTXM; + The culvert face plate is made of reinforced concrete stone 1x2 M250; - Reinforcement of talus roofs on both sides of the spillway: + Toenail cushions for stone trays 4x6 10cm thick. + Foot tray made of stone concrete 4x6, M150. + Margins and roofs are made of XM M100 mortar, 20cm thick.

Participating in tenders

Bidding method
Directly
Tender documents start selling in
08:00 08/11/2019
to
14:00 18/11/2019
Tender Document Submission at
To view full information, please Login or Register
Document Submission Fees
1.000.000 VND

Bid award

Award date
14:30 18/11/2019
Price Tender value
The estimate of the bidding package is not published in the Tender Notice (including the Tender Notice published in the bidding newspaper and the Tender Notice published in the public procurement system/national procurement network). Only DauThau.info has the exclusive feature of "scanning" the bid package price. To check the exact price of the software package, please register for one of the VIP software packages (VIP1, VIP2, VIP3...) .
Bid Opening Result
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.
Bid award
No results. Upgrade to a VIP1 account to receive email notifications as soon as the results are posted.

Bid Security

Type
Letter of guarantee or deposit by check or cash
Amount of money
18.000.000 VND
Amount in text format
Eighteen million dong

Utilities for you

Bidding information tracking
The Bid Tracking function helps you to quickly and promptly receive email notifications of changes to your bid package "The entire volume of construction work". In addition, you will also receive notification of bidding results and contractor selection results when the results are posted to the system.
Receive similar invitation to bid by email
To be one of the first to be emailed to tender notices of similar packages: "The entire volume of construction work" as soon as they are posted, sign up for DauThau.info's VIP 1 package .

Bidding cost calculator

Costs related to contractors when conducting bidding on public procurement (Article 12 of Decree 24/2024/ND-CP)

Cost type Calculation formula Applicable fees (VND)
Annual account maintenance cost
Bid submission cost
Bid submission cost
Bid winning cost
Electronic bid bond connection cost
Total estimated cost

To view bid costs

You need to Login or Register to view the bidding cost.
Support and Error reporting
Support
What support do you need?
Reporting
Is there an error in the data on the page? You will be rewarded if you discover that the bidding package and KHLCNT have not met the online bidding regulations but DauThau.info does not warn or warns incorrectly.
Views: 91

You did not use the site, Click here to remain logged. Timeout: 60 second