Contractor selection plan Package: "Construction and installation" of 02 projects (1. Project: Installing capacitor banks at the medium voltage busbar of 110kV Tang Loong 2 substation, Lao Cai province; 2. Project: Installing capacitor banks at the medium voltage busbar of 110kV Tang Loong 3 substation, Lao Cai province)