Status
Complete opening of technical documents
Bidding package name
Consulting, surveying, setting up construction design and deploying after basic design
Awarded at
Website:
http://muasamcong.mpi.gov.vn
Bidding Procedure
Single Stage Single Envelope
Contractor Selection Plan ID
Contractor Selection Plan Name
Reviewing Vam Patch stream (from the ceremony to the Cau Vam Bridge)
Contract execution period
90 day
Contractor selection methods
Competitive Bidding
Award date
14:00 17/06/2025
Bid opening completion time
14:17 17/06/2025
Tender value
Complete opening of technical documents without bidding package price
Total Number of Bidders
1
Technical Evaluation
Number Right Scoring (NR)