Project LCNT plan: Repairing 3-classroom toilets, building a new 8m2 toilet for teachers, tiling the yard, 273m2 of collapsed hallway floor, water-painting the peeling areas of the classrooms, painting the base of the sink Suoi Cao Kindergarten water at Cha Rang branch