Improving urban infrastructure of Van Chuong ward in 2024 (Improving roads and drainage systems in alleys 16, 17, Van Chuong 2 alley, alleys 27, 34, 139, 145, 177 Van Chuong alley; around the yard of the residential area of house D and house E1; Linh Quang A and Linh Quang B alleys)