Tender package No 38 (construction): Item of roads, drainage ditches and traffic safety assurance Section 2 from Tam Rong bridge to Km15+000 on Tel.763
Tender package No 38 (construction): Item of roads, drainage ditches and traffic safety assurance Section 2 from Tam Rong bridge to Km15+000 on Tel.763
Investor
Ban Quản lý dự án đầu tư xây dựng công trình giao thông tỉnh Đồng Nai
Contractor selection plan (continued) Construction investment feasibility study report Upgrading DT.763 road section from Km0+000 to Km29+500 (end of route) Xuan Loc district and Dinh Quan district (Investment phase) the section from Km8+300 to Km15+000 and the section from Km24+000 to km29+500)