Bidder Selection Plan

Contractor selection plan (continued) Construction investment feasibility study report Upgrading DT.763 road section from Km0+000 to Km29+500 (end of route) Xuan Loc district and Dinh Quan district (Investment phase) the section from Km8+300 to Km15+000 and the section from Km24+000 to km29+500)

  Watching      

Warning: DauThau.info have found this plan for contractor selection violates the form of bidding as stipulated in Article 37 of Circular No. 08/2022/TT-BKHĐT, specifically: The total number of bidding packages or the total value of online bidding packages is lower than required.

-- You will be rewarded if you detect false warnings! See instructions here!

Find: 17:35 14/10/2022
Contractor Selection Plan ID
PL2200018013-00
Publishing time
17:34 14/10/2022
Posting Status
Published
Contractor selection plan name
Contractor selection plan (continued) Construction investment feasibility study report Upgrading DT.763 road section from Km0+000 to Km29+500 (end of route) Xuan Loc district and Dinh Quan district (Investment phase) the section from Km8+300 to Km15+000 and the section from Km24+000 to km29+500)
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Project number
PR2200014821-00
Total investment
To view full information, please Login or Register
Spending Category
Investment and Development Spending
Project group
Group B
Project implementation time
5 Years
Authority that issues the decision
Ủy ban nhân dân tỉnh Đồng Nai
Approval date
29/09/2022
Approval ID
2622/QĐ-UBND ngày 29/9/2022
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using the Windows operating system and needs to install Client Agent software (Linux and MacOS cannot download Client software yet). ). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use our DauThau.info.
Our system will help you download files faster, on any device without installing Client Agent.
To download, please Login or Register

File can only be downloaded on Windows computers using Agent, please see instructions here!!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 16
1.Package 46 (consultation): E-HSMT appraisal and contractor selection results for package 45
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
2.Package 47 (consultation): Load testing of 03 bridges (Suoi Ret bridge, Tam Rong bridge, Tam Bung bridge) before being put into use
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
3.Package 49 (consultancy): Environmental monitoring (section from Km8+300 to Km15+000 and section from Km24+000 to Km29+500)
Tender/ Prequalification Notice ID
Contract execution period
300 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
4.Tender package No 44 (non-consulting): Insurance of the investor's risks during the construction process of package No. 36, 38, 40, 42
Tender/ Prequalification Notice ID
Contract execution period
1030 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Non-consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
5.Tender package No 45 (consultation): Construction supervision of package No. 36, 38, 40, 42
Tender/ Prequalification Notice ID
Contract execution period
1030 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
6.Package 41 (consultation): E-HSMT appraisal and contractor selection results for package 40
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
7.Tender package No 38 (construction): Item of roads, drainage ditches and traffic safety assurance Section 2 from Tam Rong bridge to Km15+000 on Tel.763
Tender/ Prequalification Notice ID
Contract execution period
240 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
8.Package 39 (consultation): E-HSMT appraisal and contractor selection results for package 38
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
9.Tender package No 36 (construction): Items of roads, drainage ditches and traffic safety assurance Section 1 from Km8+300 to Tam Rong bridge on Tel.763
Tender/ Prequalification Notice ID
Contract execution period
300 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
10.Package 37 (consultation): Evaluation of bidding documents (E-HSMT) and evaluation of contractor selection results for package No. 36
Tender/ Prequalification Notice ID
Contract execution period
40 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
11.Package 42 (construction): Item to build 3 bridges (Suoi Ret bridge, Tam Rong bridge, Tam Bung bridge) and ensure traffic safety on the bridge section on DT.763
Tender/ Prequalification Notice ID
Contract execution period
150 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
The estimate of the bid package is approved after the approval of the LCA
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
12.Package 43 (consultation): E-HSMT appraisal and contractor selection results for package 42
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
13.Package 48 (consultation): Traffic safety inspection (section from Km8+300 to Km15+000 and section from Km24+000 to Km29+500)
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
14.Package 50: Clearing bombs, mines and explosives (section from Km8+300 to Km15+000 and section from Km24+000 to Km29+500)
Tender/ Prequalification Notice ID
Contract execution period
60 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Specify reference
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
15.Bidding package No. 51 (consultation): Appraisal of dossier of requirements and evaluation of contractor selection results for package No. 50
Tender/ Prequalification Notice ID
Contract execution period
20 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location
16.Tender package No 40 (construction): Items of roads, drainage ditches and traffic safety assurance Section 3 from Km24+000 to Km29+500 on Tel.763
Tender/ Prequalification Notice ID
Contract execution period
300 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Capital source details
The central budget capital is 170 billion, the rest is invested from the provincial budget
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Two Envelopes
Contractor Selection Period
Q4 2022
Type of contract
All in One
Prequalification
No
Location

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Contractor selection plan (continued) Construction investment feasibility study report Upgrading DT.763 road section from Km0+000 to Km29+500 (end of route) Xuan Loc district and Dinh Quan district (Investment phase) the section from Km8+300 to Km15+000 and the section from Km24+000 to km29+500)". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Contractor selection plan (continued) Construction investment feasibility study report Upgrading DT.763 road section from Km0+000 to Km29+500 (end of route) Xuan Loc district and Dinh Quan district (Investment phase) the section from Km8+300 to Km15+000 and the section from Km24+000 to km29+500)" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 109

Greeting
Greeting,
You are not logged in, please log in to use our various functions for members.

You can use your account on DauThau.info to log in to Dauthau.Net, and vice versa!

If you are still not our member, please sign up.

Only 5 minutes and absolutely free! Your account can be use on all over our ecosystem, including DauThau.info and DauThau.Net.

Search for bid information
Click for advanced search
Statistical
  • 8361 Projects are waiting for contractors
  • 1157 Tender notices posted in the last 24 hours
  • 1869 Contractor selection plan posted in the last 24 hours
  • 24377 Tender notices posted in the past month
  • 38634 Contractor selection plan posted in the last month
Consultants are supporting you
You are not logged in.
To view information, please Login or Register if you do not have an account.
Signing up is simple and completely free.
You did not use the site, Click here to remain logged. Timeout: 60 second