Approved the Contractor Selection Plan for phase 2 of the Projects: (1) Additional installation of 110kV horizontal capacitors on Hanoi City transmission grid in 2026; (2) Install additional 110kV horizontal capacitors on the power transmission grid of Hung Yen province in 2026; (3) Install additional 110kV horizontal capacitors on the transmission grid of Bac Ninh province in 2026; (4) Install additional 110kV horizontal capacitors on the transmission grid of Ninh Binh province in 2026; (5) Install additional 110kV horizontal capacitors on Hai Phong City transmission grid in 2026; (6) Install additional 110kV horizontal capacitors on the transmission grid of Thai Nguyen province in 2026; (7) Install additional 110kV horizontal capacitors on the transmission grid of Phu Tho province in 2026; (8) Install additional 110kV horizontal capacitors on Thanh Hoa Province transmission grid in 2026