Contractor Selection Plan Name
Approving the contractor selection plan
Works on list 785/QD-EVNNPC dated 13/04/2023
Project specifics:
1. 22kV loop circuit between 471 road, 110kV Thanh Thuy station and 473 110kV Thanh Thuy station, Phu Tho province;
2. Improve the transmission capacity of 35kV loop circuit between the 372 highway of 110kV Dong Xuan station and 371 of the 110kV station of Ha Hoa, Phu Tho province;
3. 22kV loop circuit between 474 road, 110kV station, Pho Vang and 478 road, 110kV station, Pho Vang, Phu Tho province;
4. Improve the reliability of power supply grid in Tam Nong, Lam Thao, Phu Ninh, Phu Tho districts under the multi-split, multiple-connection (MDMC) plan;
5. Improve the reliability of electricity supply to the grid in Thanh Ba, Cam Khe, Doan Hung, Phu Tho districts according to the multi-split, multiple-connection (MDMC) plan;
6. Improve the transmission capacity of 22kV loop circuit between 471 highway, 110kV Phu Tho station and 472 road, 110kV Phu Ninh station, Phu Tho province;
7. Improve the transmission capacity of 22kV loop circuit between 471 highway, 110kV station Doan Hung and 476 road, 110kV station Doan Hung, Phu Tho province;
8. Improve transmission capacity of 35kV loop circuit between 374 road, 110kV station, Pho Vang street and 375 road, 110kV station Ba Khe, Phu Tho province (Phase 1)