Bidder Selection Plan

Category: Pressure pipe repair

  Watching      
Project Contractor selection plan Tender notice Bid Opening Result Bid award
Find: 10:50 23/10/2025
Contractor Selection Plan ID
PL2500264852-00
Publishing time
10:47 23/10/2025
Posting Status
Published
Contractor selection plan name
Category: Pressure pipe repair
Name of project
Category: Pressure pipe repair
Using ODA capital?
Are not
Funding source
Do not use ODA capital
Total investment
To view full information, please Login or Register
Spending Category
Other
Authority that issues the decision
CÔNG TY CỔ PHẦN ĐẦU TƯ VÀ PHÁT TRIỂN ĐIỆN MIỀN BẮC 3
Approval date
23/10/2025
Approval ID
238/QĐ-NEDI3
Approval Documents

Downloading files directly on the new Public Procurement System requires a computer using Windows operating system and installing Client Agent software (Linux and MacOS operating systems cannot install Client software yet). Therefore, to be able to download files on smartphones, tablets or computers using operating systems other than Windows, you need to use DauThau.info software to download files.
To download, please Login or Register

Files with this icon are not supported by the public procurement system for direct download in normal mode. Visit DauThau.info and select Quick Download mode to download the file if you do not use Windows with Agent. DauThau.info supports downloading on most modern browsers and devices!
In case it is discovered that the BMT does not fully attach the E-HSMT file and design documents, the contractor is requested to immediately notify the Investor or the Authorized Person at the address specified in Chapter II-Data Table in E- Application form and report to the Procurement News hotline: 02437.686.611
List of Bid:
Number of packages: 4
1.Construction and repair of pressure pipelines
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Online
Fields
Constructions
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
+ Remove rust and clean the pipeline, repaint the entire outer surface of the pipeline from MN0 to MN9. + Fabrication and supply of bearing wheels, bolts + screws, rubber gaskets for thermal joints, rubber gaskets for probe covers. + Remove and replace the support wheel assembly, clean the thermal joint assembly and probe cover assembly. + Welding and reinforcing some tendon positions to stiffen the support abutment.
Capital source details
Production and business expenses in 2025 – Appendix 03: Major repairs, SCTX in 2025
Contractor Selection Type
Open bidding
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
2.Consulting on construction supervision, construction and repair of pressure pipelines + supervision of equipment installation
Tender/ Prequalification Notice ID
Contract execution period
45 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Support the Investor in supervising construction contractors and installing equipment to ensure technical requirements according to design
Capital source details
Production and business expenses in 2025 – Appendix 03: Major repairs, SCTX in 2025
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
3.Consultancy on preparation and evaluation of tender documents
Tender/ Prequalification Notice ID
Contract execution period
30 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consultancy on preparation and evaluation of tender documents
Capital source details
Production and business plan in 2025 - Appendix 03: Major repairs, SCTX in 2025
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)
4.Consulting on appraisal of documents, appraisal of LCNT . results
Tender/ Prequalification Notice ID
Contract execution period
10 days
Domestic/ International
Domestic
Bidding method
Directly
Fields
Consulting
Regulatory compliance
Bidding Law
Tender value
To view full information, please Login or Register
Summary of main tasks of the bid package
Consulting on appraisal of documents, appraisal of LCNT . results
Capital source details
Production and business costs in 2025 – Appendix 03: Major repairs, SCTX in 2025
Contractor Selection Type
Shortened Direct Contracting
Contractor Selection Method
Single Stage Single Envelope
Contractor Selection Period
Fourth quarter, 2025
Type of contract
All in One
Prequalification
No
Implementation location (After merge)

Utilities for you:

Follow up the contractor selection plan
The Tracking of Contractor Selection Plan helps you to quickly and promptly capture the changes of the Contractor selection plan "Category: Pressure pipe repair". Our software will keep track of the contractor selection plans you have signed up for. When there are any changes, it will immediately send an email notification to you. When the bidding notice of the contractor selection plan appears, the software will also notify you.
Receive similar invitation to bid by email
To be one of the first to receive email notifications of contractor selection plans similar to the "Category: Pressure pipe repair" plan as soon as they are posted, sign up for DauThau.info's VIP 2 plan.
Views: 3

You did not use the site, Click here to remain logged. Timeout: 60 second